Resources Distribution & Network Planning

Plan the network as one problem.

Each warehouse can make a sensible decision and the network as a whole can still pay too much. Plan it together, and put a price on every exception.

Updated scimin18 minute read

A plant at the centre with four warehouses around it, each serving four dealers. Two plant-to-warehouse lanes are bold and carry goods; the other two are faint candidates.
Every lane from the plant is a candidate; the bold lanes are the ones the plan uses.
The picture as text

A square at the centre stands for the plant. Four rings around it stand for warehouses, and small dots around each ring stand for that warehouse’s dealers, joined to it by thin lines. Lanes run from the plant to every warehouse. Two of them are drawn bold, with dots along them for goods in transit: the lanes the plan uses. The other two are faint: candidates the plan considered and did not choose.

Distribution network planning decides which plant supplies which warehouse, which warehouse serves which dealer, and whether by road or rail. Planning it as one problem puts every source, warehouse, dealer and lane into one model and finds the cheapest plan that meets demand. Compare road vs rail freight cost door to door, price every standing rule, and re-run the flow plan monthly. In our illustrative example, one model cost 6.2% less than serving each dealer from its nearest depot.

scimin sells planning software and services, including network planning.

On this page

Why can serving each dealer from its nearest depot cost more?

A dealer’s cheapest source is the depot with the lowest landed cost, the cost to fill it plus delivery, and that need not be the nearest. Dealers also compete for room at the cheaper depot.

A worked example: two depots, five dealers.

One plant, two depots, five dealers, every cost in rupees per tonne: a small network of our own making shows the arithmetic. Depot A is near the plant, so filling it costs ₹800 a tonne. Depot B is far from it, at ₹1,400. Dealer D5 sits slightly nearer B: ₹600 a tonne from B against ₹650 from A. Sent through B, each tonne reaches D5 for ₹2,000. Sent through A, it costs ₹1,450.

A plant, depot A near it, depot B far from it, and dealer D5 a little nearer B. Through A a tonne costs ₹1,450 in all; through B, ₹2,000. Depot B, the one nearer the dealer, is the dearer route.A plant at the left. Depot A sits near it, at 800 rupees a tonne to fill; depot B sits far from it, at 1,400. Dealer D5, at the top right, is 650 rupees a tonne from depot A and 600 from depot B. The route through A is drawn solid and totals 1,450 rupees a tonne; the route through B is dashed and totals 2,000. Illustrative figures.plantdepot Adepot BD5₹800₹650₹1,400₹600via A: ₹1,450via B: ₹2,000
D5 is ₹50 a tonne nearer B, but filling B costs ₹600 a tonne more than filling A. Illustrative figures, not to scale.
The picture as text

A plant at the left. Depot A sits close to it and costs 800 rupees a tonne to fill; depot B sits far from it and costs 1,400. Dealer D5 is 650 rupees a tonne from depot A and 600 from depot B. The route through A is drawn solid and totals 1,450 rupees a tonne. The route through B is dashed and totals 2,000.

The full inputs follow, with demand in tonnes a month and costs in rupees per tonne. Landed cost is the cost to fill the depot plus delivery.

Dealer Demand From A From B Landed via A Landed via B
D1 20 300 1,050 1,100 2,450
D2 25 450 750 1,250 2,150
D3 30 800 350 1,600 1,750
D4 25 1,100 400 1,900 1,800
D5 20 650 600 1,450 2,000

Depot A can handle 70 tonnes a month and depot B 80. Serve every dealer from the depot nearest to it and the network costs ₹1,90,750 a month, with A at 45 tonnes and B at 75. Solve it as one linear programme and two flows change. D5’s 20 tonnes move to A, saving ₹550 a tonne. A’s last 5 tonnes of room then go to D3, saving ₹150 a tonne. The bill falls to ₹1,79,000, 6.2% less.

A quick test tells you whether a network like this one needs a solver: put each dealer on its cheapest landed cost and see whether any depot or plant overflows. Here that loads depot A with 95 tonnes against its 70. The test assumes every depot stays open.

What is supply chain network design, and what does the flow plan decide?

Supply chain network design decides which plants and warehouses a network has, where they sit and how big they are; the flow plan decides how goods move through them. A distribution network carries five decisions: which source supplies which warehouse, where plants and warehouses sit and how big they are, which warehouse serves which dealer, which mode each lane uses, and how much moves on each lane each month. Siting and sizing is design, and changes over years. The other four decisions make up the flow plan, which can change every month.

The model takes every plant, warehouse, dealer and lane, including lanes nobody uses today, with their capacities, demands and costs by mode.

A linear programme, the plainest form of supply chain optimisation, then finds the plan that meets every demand at the least total cost within every capacity. Decisions that come only in whole units, such as a warehouse open or shut or a rake booked whole, make it a mixed-integer programme. Geoffrion and Graves set distribution system design out this way in 1974 (Geoffrion and Graves, 1974). Rounding the fractional answer need not give the best whole-number plan; with suitable numbers the two can be as far apart as you like (Bradley, Hax and Magnanti, 1977, chapter 9).

Solving the example in Excel.

We solved the example in Python, and it also fits Excel’s Solver:

  1. Lay out ten flow cells, one for each depot-dealer pair.
  2. Set the objective to the SUMPRODUCT of the flows and the landed costs, to minimise.
  3. Add the limits: each dealer’s two flows add up to its demand, each depot’s five flows stay within its capacity, and no flow is negative.
  4. Choose the Simplex LP method and solve. The objective cell should show ₹1,79,000.
  5. In the Solver Results dialog, choose the Sensitivity report. It should show a shadow price of −150 on depot A’s capacity, negative because more room lowers the cost, with an allowable increase of 25 and decrease of 5.

In our experience a network with hundreds of dealers, several products and whole-unit decisions soon outgrows the standard add-in and needs a dedicated solver.

What has network planning saved, and how firm are the numbers?

The six cases below, from five publications, report figures from nearly 7.3% lower cost, in a routing-led case that also chose new hubs (Thakkar, Rastogi and Sarmah, 2025), to over $200 million a year (Camm and colleagues, 1997). Every figure among them is an estimate, a projection, or a number whose basis or baseline is not stated in what we read: the full paper, or for P&G and Delhivery the abstract.

Case Figure published What kind of figure
Kellogg, weekly production and distribution model $4.5 million in 1995 Described as an estimate; the authors call savings difficult to quantify (Brown, Keegan, Vigus and Wood, 2001)
Kellogg, capacity consolidation $35 to 40 million a year Projected by the company, in the same paper
Procter & Gamble, North American plants Almost 20% fewer plants; over $200 million a year before tax Under way when published; the abstract gives no basis (Camm and colleagues, 1997)
Walmart, network strategy No money figure Benefits measured mainly by business adoption; the paper’s $91.5 million is its truck routing and loading system’s, from FY23 operations, with no baseline stated (Mehrotra and colleagues, 2024)
ICI, production across plants (MIT course case) $4 to 10 million Identified by the model, before implementation (MIT OpenCourseWare, 2009)
Delhivery, mid-mile routing, fleet mix and new hubs Nearly 7.3% lower cost A routing-led saving, from the routing algorithm; the abstract does not say how it was measured (Thakkar, Rastogi and Sarmah, 2025)

Ask for the baseline any promised saving will be measured against, ours included.

The ICI case shows where to look first: 80% of the identified savings came from 10% of the production moves, and implementation went in phases, easiest and most valuable first. The slides advise expecting 3 to 5 months of analysis and another 3 to 6 to implement (MIT OpenCourseWare, 2009).

What data does a network planning model need, and what usually goes wrong?

A network planning model needs seven inputs: demand, capacity, source costs, lane costs, agent and C&F costs, fixed costs and rules. Each tends to fail in its own way, and the third column is our experience.

Input What goes in Where it usually fails
Demand By dealer, product and month, with its range One average month stands in for a year
Capacity What each plant can make and each warehouse can hold and handle Storage is counted, handling is not
Source costs Variable cost per tonne at each plant or supplier Assumed equal across plants
Lane costs Rupees per tonne on every lane, by mode Known for lanes in use, guessed for the rest
Agent and C&F costs As they are paid: per tonne, per case or a share of value Forced into rupees per tonne
Fixed costs Rent and staff of each warehouse that could close Left out, so keeping a warehouse open looks free
Rules Service times, contracts, dealers tied to a depot Kept in people’s heads and never priced

How far to trust the demand input is the subject of our guide to measuring forecast error; the network plan inherits every error in it. A C&F commission on value enters as a share of each lane’s value, so high-value products cost more to move through an agent.

For lanes in use, India’s e-way bills help. An e-way bill records both parties’ GSTINs, the delivery PIN code, the value, the HSN code and the vehicle number. CBIC’s training note sets the requirement at consignments worth more than ₹50,000 (CBIC, 2019). We read a year of a firm’s own e-way bills as a list of the lanes it uses and the value moved on each; tonnes come from the invoices the bills name, and small drops may be missing.

For lanes you do not use, fit each truck size’s cost as a fixed charge per tonne plus a rate per tonne-km from your own freight invoices, and apply it to each lane’s road distance. Before acting on any new lane the first solve picks, get two transporter quotes.

Planning for more than one demand scenario.

Planning for one average year is a further common failure. A design built on one average scenario may be very bad or even unfeasible under specific scenarios, as Klibi, Martel and Guitouni put it, citing Sen and Higle (Klibi, Martel and Guitouni, 2009).

On test networks, guarding against that cost little. Regret is how much worse a design does in a scenario than the best design for it, which Snyder and Daskin measure as a share of that best cost. On a 49-city network built from US census data, they report a design with about a third less maximum regret for 1.3% more expected cost; on a randomly generated 50-node network, 78% less for 0.7% more (Snyder and Daskin, 2006). Each result comes from one test network, not a company.

For design choices, such as which depots to keep or which rake contracts to sign, we build low, central and high demand from the forecast’s error range and solve each, giving three candidate designs. To cost a design under another scenario, fix its open depots and contracts, re-solve the flows with that scenario’s demand and read the objective.

A design’s regret in a scenario is how far its cost exceeds the best cost there, as a share of it. We keep the design whose largest regret is smallest, unless its average cost is more than about 2% above the cheapest design’s, our rule of thumb. The monthly flow plan is re-solved on the central forecast.

Road vs rail freight cost in India: how should the mode be chosen?

Choose the mode on each lane’s door-to-door cost; the cost per tonne-km of each mode alone will mislead. DPIIT and NCAER’s 2025 logistics cost study puts the average cost of rail at ₹1.96 per tonne-km against ₹3.78 for road, but the rail figure leaves out the first and last mile, which go by road. The road average hides a wide range: ₹1.51 for 55-tonne heavy-duty trailers and ₹11.03 for light trucks (DPIIT and NCAER, 2025).

Freight cost by mode in India, rupees per tonne-km

Light truck
₹11.03
Road average
₹3.78
Rail, excluding road at each end
₹1.96
Heavy-duty trailer (55 tonnes)
₹1.51
A light truck costs over five times as much per tonne-km as rail, so the truck that runs the end legs moves the door-to-door sum. Source: DPIIT and NCAER, Assessment of Logistics Cost in India, September 2025

The same study works out where road and rail-with-road-legs cost the same: about 600 km when each road leg is 50 km, and about 1,000 km when each is 100 km. Short of that, it finds, the first- and last-mile handling, terminal handling and trans-shipment costs at each end outweigh what the rail leg saves. Beyond it, road still dominates several routes because it is door to door and involves less documentation (DPIIT and NCAER, 2025). In our view that makes the road legs the first thing to shorten, with a depot near a goods shed, before anyone haggles over the rail rate.

Two bars to scale. With 50 km of road at each end and about 500 km of rail, the break-even is about 600 km; with 100 km legs and about 800 km of rail, about 1,000 km.Two bars to scale. The first: 50 km of road, about 500 km of rail, 50 km of road, totalling about 600 km. The second: 100 km of road, about 800 km of rail, 100 km of road, totalling about 1,000 km. Longer road legs push the break-even out.Break-even distance, door to door50 km of road at each end600 km500 km by rail100 km of road at each end1,000 km800 km by railroad legrail leg
In the study’s two cases, doubling the road legs pushed the rail leg out by three-fifths (our arithmetic). Distances from DPIIT and NCAER, 2025.
The picture as text

Two bars drawn to scale, each made of a road leg, a rail leg and a road leg. With 50 km legs the first totals about 600 km. The second bar’s legs are twice as long, and its rail leg and its total are longer.

To run the sum on your own lane, set road’s rate times the distance against rail’s rate times the rail kilometres, plus your short-haul rate times the end-leg kilometres, plus handling at both terminals. Take the rail rate from the goods office’s tariff quote for your commodity and the handling from your terminal operator.

Take a 900 km lane with 50 km legs, priced at the study’s averages. Road costs 900 × ₹3.78, or ₹3,402 a tonne. Rail with road legs costs 800 × ₹1.96 plus 100 × ₹3.78, or ₹1,946 before handling. So rail wins only if handling and trans-shipment at both ends come to less than the ₹1,456 between them. If the end legs run on light trucks at about ₹11 a tonne-km, that margin halves to about ₹730 (DPIIT and NCAER, 2025).

As a screen, we cost rail on lanes longer than about 500 km, a little short of the study’s break-even, so lanes with short end legs or cheap handling are not missed. The screen matters less where a lane already fills 55-tonne trailers, whose ₹1.51 a tonne-km undercuts rail’s average before its end legs.

Rail also comes in whole units. A block rake carries a notified number of wagons to one destination, and the Railway Board’s summary of freight measures puts the train-load rate for a full rake more or less 10% below the piecemeal rate. It also lists mini rakes, with fewer wagons, and two- or multi-point rakes, whose wagons go to two or more destinations (Railway Board, 2025). A lane that fills one and a half rakes a month is where the model needs whole numbers.

How did GST change distribution networks?

GST removed the tax reason for keeping a depot in every state, and firms began consolidating into fewer, larger warehouses. Before GST, a sale across a state line on a C-form paid 2% central sales tax, while a transfer to the company’s own depot on an F-form paid none. Almost half of India’s inter-state trade moved as stock transfers within firms (Ministry of Finance, 2017, chapter 11). Knight Frank’s warehousing report drew the network consequence: multiple state and central taxes made it sensible for companies to maintain smaller warehouses in each state. After GST it found companies consolidating into larger warehouses, and consumer-durables makers expecting up to about 40% fewer (Knight Frank, 2018). That 40% was a 2018 expectation, not a later count.

A depot-per-state network laid out before GST was, in our reading, partly built for the tax rules GST replaced, so it is the first thing to re-run.

Consolidation also cuts stock, though in published cases usually by less than the old rule of thumb says. The square-root law holds that total inventory is proportional to the square root of the number of stocking points (Maister, 1976). Across 26 published cases of cutting warehouse numbers, its estimate of total inventory was off by 27.85% on average, and it seemed mostly to overstate the saving (Oeser, 2019). Size a consolidation’s stock saving item by item with a stock model, as in our guide to inventory control.

What does a capacity limit or a standing rule cost?

A capacity limit or a standing rule costs whatever the best plan would save without it: for a limit, its shadow price; for a rule, the cost of the override. The shadow price is how much the best plan’s total cost changes when one limit is raised by one unit, with everything else held fixed. It holds only over a range, and only when that one value changes (Bradley, Hax and Magnanti, 1977, chapter 3).

The worked example: depot A’s limit and D5’s rule.

In the example, depot A is full at 70 tonnes and its shadow price is ₹150 a tonne a month. Each extra tonne of room lets one more tonne of D3’s demand come through A instead of B. That holds between 65 and 95 tonnes. Between 45 and 65 tonnes it is ₹550, because each tonne of room there lets one more tonne of D5’s demand come through A, and above 95 it is zero. So more space at A is worth renting only if it costs less than ₹150 a tonne a month, and only for 25 more tonnes.

Monthly saving from one more tonne of room at depot A

Saving per extra tonne a month

45 to 65 tonnes
₹550
65 to 95 tonnes (A today: 70)
₹150
Above 95 tonnes
₹0
A shadow price holds only over a range. Past 95 tonnes there is nothing left worth moving to depot A. scimin’s calculation on the worked example

The second number is the price of an override. Suppose D5 insists on being served from B, as before. Solve again with that rule and the plan costs ₹1,87,000 a month, so the rule costs ₹8,000 a month, about ₹96,000 a year. Depot A’s freed room goes to D3, so the re-solved plan still beats the old one by ₹3,750 a month.

Plan Cost a month (₹) Depot A (t) Depot B (t) Flows that change
Nearest depot 1,90,750 45 75 none
One model 1,79,000 70 50 D5 and 5 t of D3 to A
D5 kept on B 1,87,000 70 50 25 t of D3 to A

Whether keeping D5 on B is worth ₹96,000 a year is for the people who run the network to judge, with that number in front of them.

How often should the network be re-planned?

Re-run the flow plan every month and reopen the design only when something structural moves. The flow plan follows the forecast and the stock plan, because both change its demand. The design moves on a slower clock: Walmart’s paper says transforming each distribution centre in its programme usually takes several years from the design stage (Mehrotra and colleagues, 2024).

Structural moves include a tax change, as GST was; a new plant or market; new rail capacity along your lanes; or, by our rule of thumb, a depot whose shadow price has exceeded what extra room would cost for three months running. If your lanes run along the Western or Eastern Dedicated Freight Corridor, that trigger has arrived: by December 2025 both were commissioned apart from a 102 km section near Mumbai (Ministry of Railways, 2025).

When does a single network model not apply?

A single model is the wrong tool in four cases. The first is a network where the quick test above finds no depot or plant overflowing and no depot is up for closing: the cheapest landed assignment is then the plan. The second is a lane table full of guesses: the solve will pick lanes on costs nobody has checked. The third is a decision that rests on something that cannot be costed, such as a bet on a new market.

The fourth is an answer nobody can explain. Geoffrion’s 1976 paper is titled “The Purpose of Mathematical Programming is Insight, Not Numbers”, and its abstract says one must know not only what the best solution is but why (Geoffrion, 1976). If the plan’s main moves cannot each be explained in a sentence, we do not implement them yet.

What to do this quarter.

In our experience a first solve for one product family fits in a quarter; the ICI timings above are for a full analysis across plants.

  1. Draw the network as it is. Every source, depot, dealer and lane, with this year’s volumes.
  2. Fill the seven inputs, starting with the lane table. Take lanes in use from your e-way bills and freight invoices, and cost unused lanes from your own fixed charge and rate per tonne-km by truck size.
  3. Cost both modes door to door on every lane longer than about 500 km, our screen from the DPIIT and NCAER break-even, with your own rail quote and terminal handling.
  4. Solve with every lane a candidate. Solve the central scenario and compare it with today’s plan, listing the few moves that carry most of the gap. For depot or contract choices, solve all three scenarios and compare regret.
  5. Price every standing rule. Keep the ones worth their price, and re-run the flow plan every month.

When you choose supply chain planning software, ours included, check that it lets you do these five things.

FAQ.

What is India’s logistics cost as a share of GDP?

India’s logistics cost was 7.97% of GDP in 2023-24, by the NCAER study for DPIIT (DPIIT and NCAER, 2025). The often-quoted 13% is a 2016 model estimate by Armstrong & Associates whose data sources are not public (Munjal and Pohit, 2023).

Is network planning the same as route planning?

No. Network planning decides which depot serves which dealer, and by which mode, monthly or over years; route planning decides which truck visits which drops today. Walmart’s paper links the two as separate decision engines, for strategy and execution, in one framework and reports their benefits separately (Mehrotra and colleagues, 2024).

Sources.

20 references

Every page cited above, in the order it is first cited in the article body.

Published by scimin, a product of Pralok Enterprise, Mumbai. scimin sells supply chain planning software and services. This guide was researched and drafted with AI assistance. Every sourced figure links to the page it was checked against, and the worked example is our own illustration, with all its inputs shown. Spot an error? Tell us and we will correct it with a dated note. How we write and check our articles.

See it in the product: demand forecasting for cement and building materials, demand forecasting for fuel distribution and how the forecast is built.

Talk to us about planning your network.

Related articles.