Read the three parts
Three labelled bands. Objective: one number to minimise, such as total cost to serve. Decision variables: which depots open, and how much moves on each lane. Constraints: capacity, lead time and minimum order quantity, with demand that must be met. An inset shows a shaded feasible region bounded by two straight constraint lines and the two axes, an arrow marking the improving direction, and the optimum at the corner where the two constraint lines cross.
Supply chain optimisation (optimization, in American spelling) is the use of a mathematical model to choose the best set of supply chain decisions against one stated objective: which depots to run, which lane serves which customer, what to make when, how much to hold where.
It is one of the few words in supply chain software that means something exact. A model has three parts: an objective function to maximise or minimise, decision variables under your control, and constraints on what those variables may be (MIT 15.053, Applied Mathematical Programming). A solution is feasible when it satisfies all the constraints at once. Optimisation finds the feasible solution that scores best on the objective.
That exactness is the useful part, because it tells you what to ask. Not “is it optimised” but: best with respect to which objective, over which variables, subject to which constraints. Change any one of the three and the answer changes, which means a model’s output is a statement about its assumptions before it is a statement about your business.
scimin builds supply chain planning software, so treat this as an interested party defining its own term. None of the results below are ours, and where we quote another vendor’s documentation we name it.
On this page
The four problems that share the name.
Ask which problem is on the table, because the four behave differently and only two of them are usually solved to a proven gap.
Read the four problems
Network design decides where facilities sit and which flows serve which customers, over a horizon of years, and is usually solved to a proven optimality gap. Vehicle routing decides the sequence of stops for each vehicle, over a horizon of one day, and is usually solved by heuristics because exact methods reach only small instances. Inventory policy decides reorder points and quantities, reviewed weekly or monthly, and is usually solved by formula or simulation rather than a solver. Production planning decides what to make when on which line, over weeks to months, and is usually solved to a proven gap.
Network design.
Decides where facilities sit and which flows serve which customers, over a horizon of years. It is one of the two problems here normally solved to a proven gap: large, but structurally clean. Its oldest form and which flows serve which customers. Its oldest form is the transportation problem, formulated by Hitchcock in 1941 (Schrijver) and solved independently by Koopmans at the British-American Combined Shipping Board (INFORMS).
Vehicle routing.
Decides the order of stops for tomorrow morning. The founding paper, in 1959, addressed the routing of gasoline delivery trucks from a bulk terminal to service stations, and offered a procedure for what its authors called a near optimal solution
(Dantzig and Ramser). The capacitated version is NP-hard, and exact algorithms still find the best solution only for small instances within reasonable time (Hameed et al., 2025). Real routing runs on heuristics, and that is not a shortcoming to apologise for.
Inventory policy.
Decides reorder points and order quantities, reviewed weekly or monthly. It is usually settled by formula or simulation rather than by a solver, which is why a vendor who calls a reorder-point calculation optimisation is stretching the word. The tell is whether anything is being traded off against anything else: a formula applied item by item is not choosing between competing uses of a shared constraint.
Production planning.
Decides what to make when, on which line, over weeks to months. It is the other place a proven gap is normal, and the place where a model most often collides with a constraint nobody wrote down: changeover rules, a shared tool, an operator who can run only two of the five lines.
What a solver means by optimality.
A solver does not walk up to the best answer and stop. It holds two numbers: the incumbent, which is the best integer solution found at any point in the search (Gurobi), and a bound, which is the best objective value it has not yet ruled out. The distance between them is the gap. When the gap reaches zero the problem is solved to optimality (HiGHS documentation).
Almost nobody runs to zero. Solvers stop on a tolerance: HiGHS, for instance, stops by default at a relative gap of 0.0001 (HiGHS options). So a reported gap of 0.01% is a guarantee about distance. It says nothing about arrival. It says the relative difference between this answer and the best value not yet excluded is at most 0.01%. And the solver stops at the first point the gap falls at or below the setting, so the gap it achieves is usually smaller than the tolerance you set. Worth knowing before anyone argues about the fourth decimal place.
This is the first question to ask of any optimisation output: what gap, and against what bound. An answer with no gap attached is a suggestion.
Read the gap diagram
A chart with run time on the horizontal axis and objective value on the vertical. An incumbent line steps downward in a few discrete drops and then stays flat. A bound line rises smoothly from below. The shaded area between them is labelled as the gap. The point where the gap has narrowed enough to fall below the tolerance is marked as where the solver stops, and a bracket there spans the gap that remains when it does. The last incumbent step happens well before that point, illustrating that most of the run is spent proving the bound rather than improving the answer.
Why the mathematics stopped being the hard part.
Solvers got very fast. Between 2001 and 2020 the combined hardware and algorithmic speed-up was about 180 times for linear programming and 1,000 times for mixed-integer programming. Those are shifted geometric means over the instances both eras could solve, and the authors warn that they carry very high variance (Koch, Berthold, Pedersen and Vanaret, 2022). The algorithms alone account for about nine times on the linear side and about fifty times on the integer side, on top of roughly twenty times faster hardware.
Two things follow that matter more than the multiples.
The first is that the capability is now free. HiGHS is freely available from GitHub under an MIT licence and has no third-party dependencies (HiGHS). On the 240-instance MIPLIB 2017 benchmark in Mittelmann’s 2025 comparison, the commercial COPT solved 218 and the open-source HiGHS solved 157, with SCIP at 128 (Mittelmann benchmarks). So when a vendor’s differentiator is that they use optimisation, they have told you nothing you could not download.
The second is that speed is not the same as certainty. Of the 5,721 instances gathered for MIPLIB 2017, which include 2,051 that had been submitted for the 2010 library, 1,969 or 34% were solved by no solver within four hours (Gleixner et al.). And 149 of the 240 benchmark instances, 62%, cannot be solved within a day by any solver of 2000 to 2003 vintage, even on a modern computer (Koch et al., 2022). If a model is large and ugly, the honest answer is a good solution with a known gap.
Which of your numbers has to be right: constraints, not costs.
Errors in your costs and errors in your constraints do not behave the same way.
Ben-Tal and Nemirovski took the classic NETLIB library of linear programmes and perturbed the data by fractions of a percent. On one problem, PILOT4, they show the nominal optimum could violate a constraint by as much as 450% of its right-hand side, in the worst case allowed by a 0.1% uncertainty set (Ben-Tal and Nemirovski).
Across 90 problems, 0.01% perturbations left 19 nominal optima with a constraint the authors score as unreliable, their index for typical violation running above 5% of the limit, and 13 of those more than 50% infeasible. And in the same work, uncertainty in the objective coefficients does not essentially affect the quality of the solution (Ben-Tal and Nemirovski, 2000). MOSEK’s documentation puts the same finding in front of its users, though it counts 13 of 94 NETLIB problems where the paper counts 90 (MOSEK).
The textbook version of the same point is easier to picture: with raw-material tolerances of 0.5% and 2%, a drug-production plan the model called best is infeasible with probability 0.5 and returns about 11% less profit in expectation than promised (MOSEK).
The other side of the asymmetry is just as practical. The economic order quantity’s cost curve is famously flat near its optimum, and Dobson put a number on why that matters: sensitivity of cost to error in the model’s parameters grows only as the fourth root of the uncertainty, under minimax and expected-value criteria (Dobson, 1988).
So: the coefficients inside your constraints, your yields and rates and conversion factors, have to be right, and your unit costs can be approximate. Capacities, lead times and minimum order quantities sit on the right-hand side, which that study deliberately left out, on the view that uncertainty there hardly affects the result. That ordering is the opposite of how most optimisation projects allocate their data effort, and correcting it is the cheapest thing a buyer can do.
One limit on that. The forgiveness on costs applies to the value of the answer, not to its shape. In a model with open-or-close decisions, a small cost error can leave total cost almost unchanged while flipping which depot opens. If the recommendation you have been handed is “close Nagpur, open Indore”, ask how close the runner-up was, because that question, not the cost estimate, is the one the model can answer and nobody asks.
It also happens to be convenient, because costs are never clean. Stadtler notes that although technically possible, there is no direct link between an advanced planning system and a company’s cost accounting system (Stadtler). Cost data in a planning model is assembled, not extracted, and one practitioner guide puts extracting, transforming and loading the data at 40 to 50% of a network design project’s effort against 1 to 3% for building the slides, from its authors’ own experience rather than a study (Jahagirdar and Ahmed, SCMDOJO).
What an Indian model has to carry.
The constraints a model needs for India are tax and paperwork.
Under the IGST Act, where goods move, the place of supply is where the movement terminates for delivery to the recipient; where a supply involves no movement, it is where the goods sit at the time of delivery (IGST Act, section 10). That single rule decides which state’s tax applies to a lane, so it decides the cost of a lane, so it belongs in the model rather than in a note beside it.
Then the e-way bill. One is required where consignment value exceeds fifty thousand rupees, and states may set their own intra-state thresholds. Each bill then carries a validity clock: one day for every 200 km of regular cargo, and one day for every 20 km of over-dimensional cargo, a tenfold tighter limit (e-way bill FAQ). Note what that clock constrains. It runs on a document, not on a truck, so a model that treats it as transit time will get the answer wrong in both directions.
Worth knowing before you hard-code it: the copy of the rules published on the live e-way bill portal still prints a 100 km per day validity table (e-way bill rules), which does not match the 200 km per day the same site’s FAQ gives. When the operator’s own two documents disagree, put the rule in a parameter you can change, and confirm the live number with your tax advisor.
Two Indian logistics numbers to be careful with.
India’s logistics cost as a share of GDP
14%, quoted in 2021
Two figures turn up in almost every Indian supply chain deck, and both are shakier than their confidence suggests.
The first is logistics cost as a share of GDP. The Economic Survey 2025-26 carries a DPIIT and NCAER estimate of 7.97% of GDP for FY24, against 8.84% for FY23 and 8.79% for FY22 (Economic Survey). Note what it is: an estimate assembled from survey and model, not a measured total. FY23 and FY22 sit five hundredths of a point apart, which on a figure of this kind is no difference at all, so what the series shows is one step down in FY24 rather than a trend.
The 13 to 14% you have heard is older and weaker. NCAER records that the 13% traces to a 2017 Armstrong and Associates study for which information on the comprehensiveness of the data and its sources is not available in the public domain (NCAER). A government press release explicitly distinguishes the official estimate from commonly cited figures of 13 to 14% derived from external studies or partial datasets (PIB).
A 2021 NITI Aayog and RMI publication used 14% and reported a national target of 10% by 2022 (NITI Aayog and RMI). That is the vintage of the number still in circulation.
The second is the cost of rail against road. Here the published figures contradict each other outright. A report by BRIEF, financially supported by NITI Aayog but with its data and methodology explicitly disclaimed by it, gives road at Rs 2.5 and rail at Rs 1.36 per tonne-kilometre, citing a 2017 newspaper article (BRIEF). NITI Aayog’s own freight report prints the opposite ordering, rail at 3.67 and road at 1.67, in an exhibit sourced only by endnote whose figures do not cohere: air is printed as 18 and glossed as five times the rate of road, but road is printed as 1.67, and five times that is 8.35 (NITI Aayog and RMI). Both numbers are quoted as fact in decks today. Neither should be, and a model whose modal split rests on one of them is resting on a newspaper citation or on an unsourced exhibit.
Why a model cannot tell you what to do on Monday.
An optimisation model answers “where should this be”, not “what do I do on Monday”. The anyLogistix documentation says plainly of its network optimisation experiment that it does not take into account any dynamic characteristics (anyLogistix Help). Static is what the genre does.
The bridge is a pacing constraint. Supply chain networks rarely change overnight, and adding constraints on how much can change per period turns a single best end state into a sequence you could actually execute. Ask to see those constraints. A network study that recommends closing two depots and opening three, with no phasing, has answered a question nobody asked.
This is where optimisation earns its reputation for opacity: in an interview study of practitioners, the authors summarise the tool as a magical box: in their words powerful but opaque
, difficult to use, and reliant on specialised expertise (Lawless, Schoeffer and Udell, 2025). Little’s old test still sorts the useful models from the impressive ones, and three of his six criteria are about the manager rather than the mathematics: a model should be simple, easy to control, and easy to communicate with (Little, 1970).
What supply chain optimisation is actually worth.
Published results are real, and almost all of them are narrower than their headline.
Read the four figures
A two-column ledger. Walmart’s $91.5 million sits on the company’s own books with no audit described. Kellogg’s $4.5 million is an estimate, and two of the paper’s four authors were Kellogg employees. Zara’s 3 to 4 per cent was measured on a pilot of ten test articles against ten matched controls; the dollar figures quoted elsewhere are extrapolated from it. Intel’s $25.4 billion is a cumulative total since 2009 rather than an annual saving.
Walmart reported saving $91.5 million in fiscal 2023 by eliminating 108,000 truck routes covering 33 million miles. That is a measurement, but on the company’s own books, by its own computation, with no audit described. Its system commits at most 15 minutes to plan one distribution centre’s routes and one second to plan a truck load, using heuristic methods because of the problem’s complexity (Walmart, INFORMS).
Kellogg’s often-quoted $4.5 million was an estimated reduction in production, inventory and distribution costs for 1995; two of the paper’s four authors worked for Kellogg, and no independent audit is described. Its larger figure, $35 to $40 million a year from consolidating production capacity, is a forward estimate rather than a realised saving (Brown, Keegan, Vigus and Wood, 2001).
Zara’s authors estimate their distribution model increased sales during the selling season by 3 to 4%, after conservatively subtracting experimental error. The pilot behind that was ten test articles against ten matched control articles in the same stores. The dollar figures usually quoted come from extrapolating it: $233 million for 2007, the authors’ realised estimate at 75% of their $310 million full-year figure, and $353 million for 2008, which is the full-year counterfactual (Caro et al., 2010). Intel’s $25.4 billion is a cumulative total since 2009, not an annual saving, and the work it covers includes product architecture design as well as supply chain planning (INFORMS).
It is the ordinary distance between a result and a slide. Ask one question of any savings claim: is this a measurement, an estimate, or a projection, and against what baseline.
There is also a structural reason to expect disappointment. Smith and Winkler showed that selecting the option with the best estimated value makes disappointment the expected outcome even when every individual estimate is unbiased, because the selection itself favours whichever option’s error ran highest. In their illustration with three alternatives of genuinely equal value and independent standard-normal estimates, expected disappointment is 0.85 standard deviations (Smith and Winkler, 2006). An optimiser is a selection machine. Expect some of that gap, and say so before the project starts.
Limits: when a spreadsheet is the honest tool.
If your constraint set is short, your horizon is a week and your planner already knows the answer, a spreadsheet is the honest tool and optimisation is overhead.
The test is not sophistication, it is whether anything is genuinely being traded off. If two depots could each serve a customer and you have to choose, that is an optimisation problem however small it is. If there is one feasible answer and a planner can see it, a model adds a maintenance burden and a false air of authority. The question to ask of your own case is how many constraints actually bind, and whether anyone will keep the data behind them current after the consultant leaves. On the numbers above, that second question is where most of the cost sits.
What you are actually buying.
The case for optimisation is narrower and firmer than “it finds the best answer”. It is that once the objective, the variables and the constraints are written down, an argument about the plan becomes an argument about assumptions, which is an argument that can be settled. Geoffrion put it best: a model’s true purpose, at least in strategic applications, is to help develop insights into system behaviour, and those insights are seldom evident from the output of an optimisation run (Geoffrion, 1976).
If you want to test that against your own network, we are happy to look at it with you.
What to ask.
Nothing new, just the questions above in one place. If someone has handed you a proposal with the word optimisation in it:
- Which of the four problems is this? Network design, routing, inventory policy or production planning. The horizon usually gives it away.
- What gap, and against what bound? For network design and production planning, ask for both, and ask what gap they normally accept on a model this size and why. For routing there will be no gap and there should not be, so ask instead what the heuristic was benchmarked against, and how it compares with the plan your dispatchers produce today.
- Which numbers did your data effort go into? If the answer is costs rather than capacities, lead times and yields, it went into the forgiving half.
- How close was the runner-up? On open-or-close decisions this matters more than the cost estimate.
- Show me the pacing constraints. How many sites move per quarter, and what does the network look like at the end of the first one?
- Is this number a measurement, an estimate, or a projection, and against what baseline? Ask it of every saving in the deck, including ours.
Frequently asked questions.
Is supply chain optimisation the same as automation?
No. Optimisation chooses among options against an objective; automation executes a decision already made. A model can be fully optimised and entirely manual to act on.
Does optimisation need AI or machine learning?
No. The methods here are mathematical programming, most of it older than machine learning. Forecasting may use machine learning, and the forecast then feeds the optimisation as an input, but the two are separate steps with separate failure modes.
What does a 0.5% gap mean on a solver report?
That the relative difference between the answer you have and the best value the solver has not ruled out is at most 0.5%. It is a bound on how wrong the answer could be, not a measure of how wrong it is, and the solver stops at the first point the gap falls at or below your setting rather than at the setting itself (Gurobi support).
Which is more important to get right, my costs or my capacities?
Your constraint data, and within it your yields and rates first. Constraint errors can make an answer infeasible in practice; cost errors usually make it slightly worse. In the classic study a 0.1% uncertainty set on the coefficients inside the constraints allowed a violation of 450% of a limit, while objective-coefficient uncertainty did not essentially affect solution quality. Capacities and minimum order quantities are limits rather than coefficients, and that study deliberately left limits out, on the view that uncertainty there hardly affects the result (Ben-Tal and Nemirovski, 2000).
Can a spreadsheet do optimisation?
Yes, for small problems: spreadsheet solvers handle real linear and integer models. The limits you hit first are usually size, auditability and the fact that nobody else can safely change it, not mathematics.
Sources.
35 references
- Applied Mathematical Programming, Ch.1: Mathematical Programming — An Overview, Bradley, Hax & Magnanti / MIT
- NO experiment, anyLogistix Help (The AnyLogic Company)
- ‘It Was a Magical Box’: Understanding Practitioner Workflows and Needs in Optimization, Lawless, Schoeffer and Udell - arXiv preprint 2509.16402 (cs.HC), 19 September 2025
- Progress in Mathematical Programming Solvers from 2001 to 2020, Koch, Berthold, Pedersen & Vanaret, EURO Journal on Computational Optimization
- The Kellogg Company Optimizes Production, Inventory, and Distribution, Brown, Keegan, Vigus, Wood - Interfaces 31(6), Nov-Dec 2001
- Supply chain management and advanced planning - basics, overview and challenges, Stadtler, H., European Journal of Operational Research 163:575-588
- Optimizing Walmart’s Supply Chain from Strategy to Execution, Walmart authors - INFORMS Journal on Applied Analytics 54(1), Jan-Feb 2024
- Chapter XVI E-Way Rules - Rule 138, Information to be furnished prior to commencement of movement of goods, National Informatics Centre (NIC) / GSTN, Government of India
- E-Way Bill System - FAQ, National Informatics Centre (NIC) / GSTN, Government of India
- 11.3 Robust linear Optimization (MOSEK Optimization Toolbox for MATLAB 11.2.4), MOSEK ApS
- HiGHS Documentation — Overview, HiGHS (ERGO-Code, University of Edinburgh)
- List of options — HiGHS Documentation, HiGHS (ERGO-Code)
- Terminology — HiGHS Documentation, HiGHS (ERGO-Code)
- On the history of the transportation and maximum flow problems, Alexander Schrijver, CWI Amsterdam
- The Purpose of Mathematical Programming is Insight, Not Numbers (abstract), Geoffrion, Interfaces 7(1):81-92
- The Truck Dispatching Problem (abstract), Dantzig & Ramser, Management Science 6(1):80-91
- Sensitivity of the EOQ Model to Parameter Estimates, Operations Research (INFORMS); abstract via RePEc/IDEAS
- Intel uses O.R. in Corporate Decision-making, Realizing $25 Billion in Benefits, INFORMS
- The Optimizer’s Curse: Skepticism and Postdecision Surprise in Decision Analysis, Management Science (INFORMS); author copy hosted at Dartmouth
- A Detailed Review of the Capacitated Vehicle Routing Problem, Journal of Internet Services and Information Security (JISIS)
- Report on Logistics Cost in India (2023), National Council of Applied Economic Research (NCAER)
- Models and Managers: The Concept of a Decision Calculus, Little, J.D.C., Management Science 16(8):B-466-B-485
- Latest Benchmark Results (INFORMS 2025 talk), Hans D. Mittelmann, Arizona State University
- About the MIPgap — Gurobi Help Center, Gurobi Optimization (staff answer, Jaromil Najman)
- Section 10, IGST Act 2017 - Place of supply of goods other than goods imported into, or exported from India, Central Board of Indirect Taxes and Customs (CBIC), Government of India
- Zara Uses Operations Research to Reengineer Its Global Distribution Process, Caro, Gallien et al. - Interfaces 40(1), Jan-Feb 2010
- MIPLIB 2017: Data-Driven Compilation of the 6th Mixed-Integer Programming Library, Gleixner et al. - Mathematical Programming Computation
- Mixed-Integer Programming (MIP) — A Primer on the Basics, Gurobi Optimization
- Economic Survey 2025-26, Chapter 8 (Industry; includes Infrastructure and Logistics section), Ministry of Finance, Government of India
- Biographical Profile: Koopmans, Tjalling C, INFORMS
- Fast Tracking Freight in India: A Roadmap for Clean and Cost-Effective Goods Transport, NITI Aayog, RMI and RMI India
- Improving Rail Efficiency and Share in India’s Freight Transport, BRIEF (funded by NITI Aayog, which disclaims its data and methodology)
- Piyush Goyal launches report on Assessment of Logistics Cost in India, Press Information Bureau, Government of India
- Supply Chain Network Design & Optimization: Steps, Guide, and Efforts, Jahagirdar, Ershad & Ahmed, Muddassir - SCMDOJO
- Robust solutions of Linear Programming problems contaminated with uncertain data, Mathematical Programming (Springer); author copy hosted at Georgia Tech ISyE
Published by scimin, a product of Pralok Enterprise, Mumbai. scimin sells supply chain planning software and services. This article was researched and drafted with AI assistance. Every sourced figure links to the page it was checked against. Spot an error? Tell us and we will correct it with a dated note. How we write and check our articles.