Open the demo in a new tab
ProductIndustriesResourcesSecurityAboutContactOpen the demo in a new tab

Resources Buyer’s Guides

How to choose supply chain planning software in India.

Twelve tests an Indian buyer can run themselves, in place of the feature checklist a planning software vendor hands over.

scimin24 minute read

A decision sheet of twelve numbered tests in two columns under four headings: proving the forecast, getting the data, sizing the risk, judging the claims. Each is a test the buyer runs, not a vendor claim.Twelve numbered tests in two columns under the article’s four headings: proving the forecast, getting the data, sizing the risk, and judging the claims. Each test is something the buyer runs rather than a feature the vendor claims.Proving the forecast1Beat seasonal naive2Service and stock3See the override logGetting the data4Price the extract5Name the breaks6You pick the holdoutSizing the risk7A phase you can stop8Test the export9The 2027 duties, nowJudging the claims10Capability first11Whose decision is it12Baseline first
The twelve points, grouped by what each one tests. Nothing on the sheet is a feature: every row is evidence you produce.
Read the twelve points

Twelve tests in two columns under four headings. Proving the forecast: beat seasonal naive; service and stock; see the override log. Getting the data: price the extract; name the breaks; you pick the holdout. Sizing the risk: a phase you can stop; test the export; the 2027 duties, now. Judging the claims: capability first; whose decision is it; baseline first.

Choose a planning tool on evidence you generate, not claims you are shown. The twelve tests below do that: make the forecast beat your own seasonal naive, write the acceptance criterion in fill rate at a fixed stock level rather than in accuracy, price the extract out of Tally or Marg, scope a first phase you could abandon, and put the 2027 privacy obligations into a 2026 contract. Most of what decides the outcome sits on your side of the table.

scimin sells supply chain planning and demand forecasting software and the services around it, so read this as a firm setting out the criteria it expects to be judged on. It names no competitor and ranks nobody. Where a point rests on published evidence we link it; where it is our own judgement we say so.

On this page

What are you buying, and what does your ERP already do?

Supply chain planning software decides what to make, buy and move, and how much to hold where. Demand forecasting is the part of it that predicts what you will sell. Your ERP, by contrast, records what happened and executes what someone already decided, and that boundary is where most disappointment starts: the two look similar in a demo and behave differently on a Tuesday.

Write down the decision you want the tool to make, then check what you already have. In TallyPrime the reorder level and quantity are numbers a user types, with an option to derive the quantity from consumption over a period you choose (Tally Solutions). That is your baseline, and it is a low bar, which is why a vendor clearing it proves very little.

Gaps in the big ERP planning engines are mundane rather than dramatic. Microsoft documents that step consumption is ignored on bill-of-material and formula lines when its Planning Optimization engine is on, and tells customers to run a fit analysis against their own configuration before switching (Microsoft Learn). Copy that habit. The fit analysis is the buyer’s move.

The twelve points.

Each row is a test, and each number links to the section that explains it. The middle column says what the test is for; the right column is the thing you actually do.

# The point What it tests The test you run
1 Beat your own seasonal naive Whether the engine earns its fee Their setup, your history, scored against a benchmark you named first
2 Judge it on service and stock, not accuracy Whether accuracy is the right gate Fill rate at a fixed stock level, or stock at a fixed fill rate
3 See the override log Whether the plan survives contact with people Ask who changed what, by how much and why, with reason codes
4 Price the extract from the system you run Whether integration is real or a tick A live extract from your own version of Tally, BUSY or Marg, priced
5 Name the breaks in your history Whether the model knows your market Ask what it does with the 22 September 2025 rate change
6 Choose the holdout and the SKUs yourself Whether the demo means anything You pick the period and the sample, and you re-run it on a second period
7 Scope a first phase you could abandon Whether the risk is survivable One decision, one category, and a date on which you would stop
8 Prove the export before you sign Whether you keep the asset Run a full export, name the format in the contract
9 Carry the 2027 obligations in the 2026 contract Whether the contract ages well Vendor breach notice well inside 72 hours, logs kept a year
10 Score capability before anyone sees the price Whether your own process is sound Close the technical scoring before the commercial envelope opens
11 Name the decision the AI makes Whether the claim is a planning claim Ask what happens when the agent is wrong, and who notices
12 Baseline your own numbers before you sign Whether you will ever know Record forecast error, stock days and fill rate first

Point 12 is work you do before you speak to anyone. Points 1 to 6 and 11 are what you ask in the room and settle in the proof of concept, which includes making the vendor run the extract and the export in front of you. Points 7, 8 and 9 are contract terms, and point 10 is the order you run the whole thing in. Out of order, a selection loses its leverage.

Points 1 to 3: proving the forecast.

Point 1: beat your own seasonal naive.

A seasonal naive forecast sets each period equal to the last observed value from the same season (Hyndman and Athanasopoulos). Last year’s same month, in other words, which many planners already compute in a spreadsheet. It is the honest comparator, and clearing it is harder than it sounds.

The M5 competition put 5,507 teams on Walmart retail data. Of those, 48.4% beat a naive forecast and 35.8% beat seasonal naive, while 415 teams, or 7.5%, beat ES_bu, the strongest statistical benchmark in the competition (Makridakis et al., 2020). It was an open contest on Kaggle, so the field included casual entries as well as serious ones.

Share of M5’s 5,507 teams that beat each benchmark

Naive forecast
48.4%
Seasonal naive
35.8%
ES_bu (best statistical benchmark)
7.5%
Ask which benchmark a quoted accuracy figure beat. Without one, the number cannot be read. Source: Makridakis, Spiliotis and Assimakopoulos, M5 Accuracy competition (2020)

Read the spread, not the average. All of M5’s top 50 submissions beat the best benchmark by more than 14% (Makridakis et al., 2020). Method choice matters a great deal; the median entrant is on the wrong side of it. What you are buying is a vendor’s ability to configure their tool for your data, so test their setup on your history.

Be careful what they show you. Forecast accuracy will almost always be worse, and often much worse, than the fit of the model to history (Gilliland, Analytics Magazine). A chart that tracks last year beautifully is a fitting exercise, not a forecast.

Point 2: judge it on service and stock, not accuracy.

This is the point most selection guides get wrong. Tested on the M5 data, the link between forecast accuracy and inventory performance may often be weak, and depends on the ratio of holding cost to lost-sales cost; where lost sales cost more, and for short lead times, the preferable method may not be the most accurate one (Theodorou et al., 2025, abstract).

It can run backwards. On 1,000 simulated intermittent series with parameters taken from a spare-parts dataset, neural networks scored worse on accuracy and bias than Croston and its variants yet reached higher service levels in the inventory simulation, and the author concludes that accuracy metrics alone can sometimes lead to misleading conclusions on intermittent demand (Kourentzes, 2013).

There is a measurement trap underneath this. Percentage error is undefined or infinite when actual demand is zero, which is why the literature proposed alternatives for intermittent items (Kim and Kim, 2016). A single headline accuracy percentage therefore excludes your slow movers, which is where your dead stock sits. Split the test set by intermittence, and write the acceptance criterion in fill rate at a fixed stock level. Treat accuracy as a diagnostic.

Point 3: see the override log.

Every tool lets a planner change the number. The question is whether it makes the damaging changes visible.

Across more than 60,000 forecasts at four supply chain companies, judgemental adjustment raised average accuracy in three of the four, but the smaller adjustments often damaged it and upward adjustments were much less likely to help than downward ones (Fildes et al., 2009, record). On promotions, across 169 SKUs and 1,515 cases, managerial adjustment improved the baseline but not systematically, while a transfer-function model on past promotion data had lower overall errors (Trapero et al.).

So override itself is not the problem. The small, upward, unrecorded override is. Our rule of thumb: ask to see an existing customer’s log with the names removed, check that every change carries a reason code rather than a free-text box, and ask whether the tool reports forecast value added per planner. Without those three, you are buying an optimism bias you will never see.

Points 4 to 6: getting the data, and who picks the test.

Point 4: price the extract from the system you run.

Integration is a tick on every vendor’s feature list and a real cost on yours.

Marg publishes the price: its corporate app solution, described as data through API, is listed at Rs 10,000 per year per branch plus Rs 11,000 one-time implementation (Marg). For a twelve-branch distributor that is over a lakh a year merely to let another system read its own sales. Tally charges nothing extra in licence but sets a technical ceiling: applications can post XML to its endpoint on default port 9000, and its ODBC documentation states that only first-level methods of an object are exposed directly (XML, ODBC). BUSY’s export and import FAQ names Excel and XML, and no API (BUSY).

Three rows: Tally exports by XML and a first-level-only ODBC with no separate licence line, BUSY by Excel and XML with no API and no published price, Marg by API at Rs 10,000 a year per branch.Three rows. TallyPrime: XML to the HTTP endpoint on port 9000, and ODBC exposing first-level methods only, with no separate licence line. BUSY: Excel and XML export, with no API in its export FAQ, and no published price. Marg: data through API, at ten thousand rupees a year per branch plus eleven thousand once.Getting the history outTallyPrimeXML to the HTTP endpoint on port 9000;ODBC, first-level methods onlyNo separate licence lineBUSYExcel and XML export;no API in its export FAQNo published priceMargData through APIRs 10,000 a year per branchplus Rs 11,000 onceAsk for a live extract from your own version.
Marg is the only one of the three to publish a price for the route, which is why extraction belongs in the business case rather than the feature list.
Each route in words

TallyPrime: XML posted to the HTTP endpoint on default port 9000, and ODBC where only first-level methods of an object are exposed directly; no separate licence line. BUSY: the data export and import FAQ documents Excel and XML, names no API, and publishes no price. Marg: a corporate app solution described as data through API, listed at Rs 10,000 per year per branch plus Rs 11,000 one-time implementation.

Set that against what you pay for the books: a TallyPrime Gold multi-user licence is listed at Rs 24,300 plus GST for twelve months, or Rs 67,500 plus GST perpetual (Tally Solutions). Put extraction in the business case as its own line, and make a live extract from your own version part of the evaluation rather than a post-signature surprise.

We looked for a credible published price for planning software in India and did not find one. Vendors quote on request, the directory sites carry no method, and the market reports that do carry figures disagree with each other by multiples. So do not calibrate against a number you read. Get two written quotes on your own scope, and set them against the extraction cost above and the carrying-cost arithmetic in the example below.

Point 5: name the breaks in your history.

One break and one cap sit in every Indian demand series right now, and neither appears in a demo.

The break: GST moved to two main slabs, 5% and 18%, with effect from 22 September 2025 (PIB). Shelf prices changed mid-series, so an engine that has not been told will read a price and mix shift as a demand shift. Ask directly: what does your model do with the 22 September 2025 rate change in my history? That is sharper than anything about artificial intelligence.

The cap: the government also holds a clean copy of some of your sales and dispatch data. NIC documents e-invoice APIs including Generate IRN and Get GSTIN Details, with sandbox testing enabled by turnover band, the lowest documented band above Rs 5 crore (NIC), and the e-way bill system covers consignments above Rs 50,000 (NIC). The cap is on what you can still create there: since 1 January 2025, NIC’s release notes bar generating an e-way bill against a document more than 180 days old, and cap extension at 360 days from generation (NIC). Ask the vendor which of these feeds it can read, and in what form.

Point 6: choose the holdout and the SKUs yourself.

When the vendor picks the period, the sample and the metric, what you are watching is a presentation with numbers on it rather than an experiment. Turn it round.

Freeze a holdout the vendor cannot see. Pick the SKU sample yourself, including the ugly intermittent tail rather than the twenty products that behave. Name the benchmarks in advance, naive and seasonal naive at minimum. One scored submission. Then re-run the same script on a second period, because a single window rewards a lucky configuration.

Two reasons to be strict about this. A model tuned until it fits your history will still forecast worse than that fit suggests (Gilliland, Analytics Magazine), and a survey of the machine-learning literature counted leakage errors, where information from the test period reaches the model, reported in 329 papers across 17 fields (Kapoor and Narayanan, 2022). If it happens in published research, it will happen in a four-week bake-off nobody audits.

Points 7 to 9: sizing the risk.

Point 7: scope a first phase you could abandon.

The strongest relationship anyone has measured here is about size rather than software.

On Standish’s own definition, which counts a project successful only when it was on time, on budget and gave a satisfactory result, 61% of small projects succeeded against 6% of the grand class, its largest (CHAOS Report 2015). Treat the definition with care, because it measures estimating as much as software, and Standish has never explained how it picked its sample (Eveleens and Verhoef, IEEE Software). The gradient is the usable part; the headline failure rate is not. And the risk sits in the tail: across 1,471 IT projects the average cost overrun was 27%, but one in six overran by 200% on average (Flyvbjerg and Budzier).

So write the stop point down before you start: one planning decision, one category, and a date on which you will extend or stop. A phase with no stated end gets defended rather than abandoned.

Projects called successful, by project size

Share called successful

Small
61%
Moderate
24%
Medium
12%
Large
11%
Grand
6%
Successful here means on time, on budget and a satisfactory result, which is a measure of estimating as much as of software. The gradient is the point. Source: The Standish Group, CHAOS Report 2015

Avon showed publicly what a survivable first phase looks like: it halted the global roll-out of its Service Model Transformation programme in the fourth quarter of 2013 after the Canada pilot caused significant business disruption, and said so in its risk factors (Avon 10-K). The pilot did its job. It stopped something.

A caution on the cautionary tales. Nike’s Form 8-K blames its Q3 FY2001 miss on weakness in US footwear as well as a new demand and supply planning system, and the vendor name, the $100 million of lost sales and the $400 million programme cost that travel with the story appear nowhere in it (Nike 8-K). Ask which filing a disaster story came from.

Point 8: prove the export before you sign.

The clearest Indian case in the public audit record turns on losing control of the asset rather than on a bad algorithm, and in our practice that is the commoner failure.

India’s Comptroller and Auditor General examined a state utility, JBVNL, which paid Rs 41.05 lakh of a Rs 59.40 lakh work order for a capital-expenditure information system containing an Rs 18 lakh materials-management module. The source code was never handed over, the agency withdrew, and as of July 2022 the master data keyed into the abandoned system had still not been put to use, because the replacement had not been implemented (CAG).

For software as a service, the escrow that matters is not the one people ask for. UNCITRAL’s guide lists automatic release of source code or key escrow allowing access to customer data as things the parties may specify, ranking neither (UNCITRAL). Source code you cannot run is worth little; your own data in a documented format is worth a great deal. Run a full export during the evaluation, name the format in the contract, and treat egress charges as negotiable: the European Union removes switching charges entirely from 12 January 2027 (European Commission).

Point 9: carry the 2027 obligations in the 2026 contract.

Most of what India’s data protection rules require is not in force yet, and that is the reason to act now rather than later.

Rules 1, 2 and 17 to 21 commenced on publication, rule 4 at twelve months, and rules 3, 5 to 16, 22 and 23 eighteen months after publication, which puts them in mid-May 2027 (DPDP Rules, 2025). The notification is numbered G.S.R. 846(E) and dated 13 November 2025; the government announced it as notified on 14 November (PIB). If you are writing a date into a contract, use the Gazette. A tool you choose now will be finishing its first full annual planning cycle around the time the substantive duties land. Your vendor has no obligation to retrofit them for free then, and every reason to agree to them while the deal is still open.

Three things belong in that contract.

Safeguards and retention. Rule 6 names encryption, obfuscation, masking or virtual tokens, and separately appropriate measures to control access to computer resources. It also requires logs and personal data to be kept for a year unless another law says otherwise (DPDP Rules; DSCI summary).

Breach notice. Reporting runs in two stages: intimation to the Data Protection Board without delay, then the detail within 72 hours, a period the Board may extend. Affected individuals must be told without delay (DPDP Rules). You only learn of a breach when your vendor tells you, so the vendor’s deadline has to sit well inside 72 hours. Otherwise yours is unmeetable by construction.

Accountability. It does not move. The Act makes the Data Fiduciary responsible for processing done on its behalf, and allows engaging a processor only under a valid contract (DPDP Act, 2023).

Two common beliefs are worth correcting. The exposure in a planning tool is narrower than the pitch suggests: the Act defines personal data as data about an identifiable individual, so SKU history, stock, bills of material and capacity fall outside it (DPDP Act). Your dealer master and your user accounts are what sit inside. Scoping the extract to leave out proprietor names and mobile numbers is the cheapest compliance move available, and no vendor will propose it.

Nor is this a localisation law. Transfer abroad is permitted by default unless the Central Government restricts a country, and rule 15 allows it subject to requirements the Government may specify (DPDP Act; DPDP Rules). Making Indian hosting a hard gate may buy a constraint the statute never imposed, while the things it did impose go unwritten.

A timeline from November 2025 to May 2027: rules 1, 2 and 17 to 21 in force at the left, the rest commencing at the right, and a bar from today marked as your first full planning cycle.A timeline from November 2025 to May 2027. At November 2025 rules 1, 2 and 17 to 21 are in force. At May 2027 rules 3, 5 to 16, 22 and 23 commence. A marker shows today, September 2026, and a bar shows a first full planning cycle running from today to the later commencement date.Nov 2025In force now:rules 1, 2, 17 to 21May 2027Then: rules 3,5 to 16, 22 and 23TodayYour first full planning cycle
You sign at the Today mark. The duties land at the far right, which is why they cost less to negotiate into this contract than to retrofit into the next one.
What commences when

A horizontal timeline from November 2025 to May 2027. At the left, November 2025: in force now, rules 1, 2 and 17 to 21. At the right, May 2027: then rules 3, 5 to 16, 22 and 23. A tick below the line marks today, September 2026, and a bar runs from there to May 2027 labelled: your first full planning cycle.

Points 10 to 12: judging the claims.

Point 10: score capability before anyone sees the price.

The commonest mid-market pattern is a demo day where the discount lands before the planner has scored the fit. Public procurement does not allow that, for a reason.

The Asian Development Bank’s guidance for procurement under the projects it finances says subjective impressions, unverified assumptions or information from outside the bid are not acceptable bases for scoring (ADB). Nothing obliges a private buyer to follow it. It is simply the rule that stops a discount deciding a technical question. Two habits transfer from that world: close the technical scoring before the commercial envelope opens, and record the evidence behind each score.

Freeze the shortlist before applying weights, too. In pairwise scoring of the kind consultants set up, adding or removing an alternative can reverse the ranking of the others (Tu and Wu, 2023).

Analyst quadrants deserve their own caution, and it is a matter of record. In ZL Technologies v Gartner the district court, ruling on a motion to dismiss, held that Gartner presents Magic Quadrant results as subjective views rather than objective fact, and that the weight it applies is not verifiable (ZL Technologies v Gartner). Gartner’s own methodology page says to keep in mind that focusing on the leaders’ quadrant is not always the best course of action (Gartner). Use a quadrant to find candidates, never to rank them, and check its vintage: the supply chain planning quadrant was split in 2026, so a shortlist built from a single older one is built from the wrong document (Gartner, Kinaxis).

Point 11: name the decision the AI makes.

Ask which decision the model or the agent takes on its own, what it does when it is uncertain, and what happens when it is wrong. Then ask who notices.

Gartner predicts that over 40% of agentic AI projects will be cancelled by the end of 2027 on escalating costs, unclear business value or inadequate risk controls, and estimates only about 130 of the thousands of self-described agentic vendors are the real thing (Gartner). That is a prediction with no stated method, so weigh it accordingly. Buy the planning, and let the agents prove themselves on your data like everything else.

Point 12: baseline your own numbers before you sign.

You will have no external comparator at renewal, and this is checkable rather than rhetorical.

Search the United States market regulator’s full-text archive of annual and quarterly filings for the exact phrase “a new demand planning system” and it returns four filings from two companies (EDGAR full-text search). Four, across every annual and quarterly report filed since 2001. The archive undercounts, because an exact phrase misses every other way of saying it, but the order of magnitude is the point: almost nobody puts the outcome of one of these projects on the record.

So record yours before you sign. Forecast error at the level and horizon you plan at, stock days by category, fill rate. In our practice the baseline is the most valuable thing a buyer produces during a selection, and the most often skipped.

An example: scoring two shortlisted vendors.

Illustrative numbers, to show how the tests resolve a close call. Both vendors have cleared the technical threshold. Assume a 24-month history, 1,800 active SKUs, and a stated target of 95% fill rate on the A class.

Test (illustrative figures) Vendor A Vendor B
Beat seasonal naive on your holdout, all SKUs yes yes
Beat it on the intermittent tail no yes
Stock at 95% fill rate, against today 3% lower 11% lower
Override log with reason codes no yes
Live extract from your Tally version ran in evaluation not attempted
Export format named in contract refused agreed

On a feature scorecard these two look close, and A demos better. On the tests, B answered points 2, 3 and 8 while A failed the one that decides whether you can leave. The difference that matters, 11% against 3%, came from the tail, which a headline accuracy figure would have hidden.

B is not clean either: it never attempted the live extract, so point 4 is unanswered, and that is the row to settle before signing rather than after. A vendor that will not run an extract during evaluation is telling you something about what the integration will cost.

Two panels. Once: Rs 32 lakh of stock released. Every year: about Rs 4.5 lakh saved by holding less, against Rs 6 lakh of extra licence, the larger of the two.Two panels on different clocks, not drawn to one scale. Once: stock released, Rs 32 lakh, shown as an outlined block because it is a single event. Every year: what holding that stock cost, about Rs 4.5 lakh, against the licence difference of Rs 6 lakh, drawn to a shared scale so the licence bar is the longer of the two.Two different clocksOnceRs 32 lakhstock released,one time onlyEvery yearRs 4.5Lsaved by holding lessRs 6Lextra licencePanels are not to one scale. The right-hand pair is.
The two panels are not drawn to one scale, because they cannot be: a sum released once and a sum spent every year are different quantities. Business cases compare them anyway.
Why the panels differ

Two panels on different time bases. Once: stock released, Rs 32 lakh. Every year: what holding that stock cost, about Rs 4.5 lakh, against the licence difference of Rs 6 lakh. Only the annual pair can be compared, and the licence is the larger of the two.

Then run the arithmetic honestly, which most business cases do not. At a stock value of Rs 4 crore, an 8-point difference in stock released is Rs 32 lakh, but that is a one-time release of working capital. The recurring benefit is what the money costs you to hold: at a 14% carrying cost, Rs 32 lakh released saves about Rs 4.5 lakh a year. Against a licence difference of Rs 6 lakh a year, the stock case alone does not pay, and on these assumptions it would not pay until stock reached about Rs 5.4 crore. Netting a one-time release against an annual fee is the commonest way a planning business case flatters itself. If the case only works that way, it does not work.

When not to buy a planning tool.

Sometimes the answer is no, or not yet. Three signals.

Your process is not the constraint the tool addresses. In a ranking of eight ERP implementation issues reported by Indian SMEs, selecting the package came seventh (Basu et al., 2012). Sponsorship, goals and project management ranked above it. That ranking comes from a small, self-reported sample and is ordinal, so treat it as a pointer rather than a measurement. If nobody owns the plan, better software will produce a better-formatted argument.

You have not been near a vendor yet. Of the 225 companies SelectHub interviewed about an ERP search, 87% of those willing to spend only six months on it had not contacted a vendor or sat through a demo (SelectHub). The sample is small and self-selected, and the page has been updated since 2018. Read it as a caution, not a statistic: a short timetable that never meets the product is worse than a long one.

The spreadsheet is still doing the job. In a survey of 164 self-selected practitioners run by a firm that sells sales and operations planning training, 81.1% said they run the process in Excel or Google Sheets and 5.1% on a dedicated tool, and one respondent put it plainly: “Even with SAP, we always end up back in Excel” (AbcSupplyChain). A disciplined spreadsheet with an owner beats a tool nobody trusts. We wrote separately about the five questions that tell you when the spreadsheet has actually run out.

Finding this hard is normal. India SME Forum’s 2025 report puts the share of its 7,835 respondents who struggle to find the right digital tool somewhere between 35.6% and 52.6%, depending which of its own two figures you read, from a convenience sample drawn from its own network (India SME Forum). Either way it is common, and it is on your side of the table, which is where the twelve points put it.

FAQ.

How much history do we need before a tool is worth testing? Enough to hold back a real out-of-sample period and still fit on the rest, with your seasonality represented. Twenty-four months is a workable floor, and you need to know where the 22 September 2025 rate change sits in it (PIB).

What accuracy should we expect? Ask what your current error is instead, because that is the only number the decision turns on. Published benchmarks are mostly self-reported and vary by item, horizon and level.

Who should run the selection? Whoever will own the plan, with finance and whoever does the integration. Keep the scoring with the people who live with the result, and follow the sequence in point 10.

Sources.

46 references

Published by scimin, a product of Pralok Enterprise, Mumbai. scimin sells supply chain planning software and services. This article was researched and drafted with AI assistance. Every sourced figure links to the page it was checked against. Spot an error? Tell us and we will correct it with a dated note. How we write and check our articles.

See it in the product: the demos, one for each industry, the app, industry by industry and how the forecast is built.

Talk to us about your planning process.