Open the demo in a new tab
ProductIndustriesResourcesSecurityAboutContactOpen the demo in a new tab

Resources Demand Forecasting & Planning

A forecast should say how wrong it has been.

One accuracy percentage hides the three numbers a planner needs. The size of the miss in units, that miss as a share of what sold, and which way it leans.

Updated scimin22 minute read

A cobalt forecast line runs inside a pale cobalt band. Sixteen dots mark what sold each week, those away from the line joined to it by a short dashed leader. One hollow ringed dot sits clearly above the band.
One week falls outside the range. A range that is honest says how often that happens, and then it is checked.
The picture as text

A forecast drawn as a line with a shaded band around it. Sixteen weekly actuals are drawn as dots. Fifteen fall inside the band and are filled; one, in the second half of the series, sits above the band and is drawn hollow with a ring. Dashed leaders join the dots that sit away from the line to the line itself, so the length of a leader is that week’s error.

Forecast error is the gap between what a forecast said and what sold. Measuring it well takes three numbers rather than one: the average miss in units, that miss as a share of what sold, and which way it leans. Then one comparison: what last period repeated would have scored on the same data. The percentage alone is the least useful, and on a growing business it improves by arithmetic with no improvement in the forecast.

On this page

What is forecast error in supply chain planning?

Fix the subtraction before anything else, because every sign in every report downstream depends on it, and which way round it runs is the first thing a planning team has to agree. The convention in the forecasting literature is that the error is what sold minus what was forecast. A positive error therefore means the forecast was too low. Hyndman puts the consequence plainly: positive errors arise only when the forecast is too small. (Hyndman, 2014)

Three words get used across supply chain management, often as if they meant the same thing, and they do not. Which of them you report changes what your team does next, which is a different problem from why forecasts go wrong in the first place.

Error is the gap for one item in one period. Accuracy is a summary of many errors, usually dressed as a percentage, and it throws away the sign. Bias keeps the sign and adds it up. A forecast that is too high in January and too low by the same amount in February has real error and no bias. A forecast that runs high by a small margin every month of the year has modest error and a bias that fills your warehouse. Bias is the one that compounds, and it is the one an accuracy percentage cannot show you.

Which forecast error metrics should you report?

Mean absolute error is each miss with the sign thrown away, averaged, written by Hyndman and Koehler as Mean Absolute Error (MAE) = mean(|et|) (Hyndman and Koehler, 2006). Being in units, it reads directly as stock, and for the same reason it will not compare a fast mover with a slow one.

Weighted absolute percentage error fixes that by dividing by total actual sales, and it survives a month with no demand, which a plain percentage error does not. Bias keeps the signs: above zero the forecast ran low, below zero it ran high.

Measure How it is computed Read in What it drives the forecast to
Mean absolute error (MAE) total absolute error ÷ number of periods units the median
Weighted absolute percentage error (WAPE) total absolute error ÷ total actual sales per cent the median
Bias signed errors summed ÷ total actual sales per cent, with a sign nothing; it reports direction

In a vendor meeting the middle row is the one to watch, because it answers to several names. Hyndman gives the lineage, The WAPE was introduced by Kolassa & Schütz (2007) who called it the MAD/Mean ratio (Hyndman, 2025), and the authors’ own framing is that the ratio can be viewed as a weighted mean of absolute percentage errors (Kolassa and Schütz, 2007). So it is not a rival family to MAPE. It is MAPE weighted by volume. Kolassa’s later work writes it wMAPE, and the Institute of Business Forecasting’s glossary lists it as WMAPE (IBF).

One caveat on our own recommendation. That later paper argues that measures such as MAD, MASE and wMAPE are inherently unsuitable for count data, which is what a slow-moving catalogue is (Kolassa, 2016). We report WAPE on items that sell in most periods; slow movers need something else.

At least one major platform shipped it under the wrong name. Amazon’s own documentation records that Amazon Forecast previously referred to the WAPE metric as the Mean Absolute Percentage Error (MAPE) (AWS). The Institute of Business Forecasting’s glossary entry for WMAPE says in its own body text that MAPE is where errors are weighted by sales volume. (IBF) If a practitioner body’s glossary conflates them, a vendor deck will too. Our rule in evaluations is to ask for the formula and never accept the acronym.

Why is your forecast accuracy percentage misleading?

Start with the easy failure. A percentage error divides by what sold, so in a month that sold nothing it is undefined. The usual fix is to drop those months, which is not neutral: the ones removed are exactly those where any forecast above zero was wrong.

The harder failure sits in the measure’s own literature. A much-cited statement of which way MAPE leans appears in Hyndman and Koehler’s 2006 paper, and its first author has since corrected it: Unfortunately, Anne Koehler and I got it the wrong way around in our 2006 paper on measures of forecast accuracy, where we said the heavier penalty was on positive errors. The correct statement is that the heavier penalty falls on negative errors (Hyndman, 2014). In the convention fixed at the top of this article, a negative error is a forecast that ran high.

Even the corrected direction is disputed. One rebuttal argues that MAPE has no such lean at all, since If the actual value stays constant, the APE is equal for both types of errors (Fischer, STATWORX, 2019). So take the narrow, firm point: a measure whose own literature cannot agree whether or which way it leans is a poor basis for a target or a bonus. The measure that carries a direction unambiguously is bias.

A growing business has a third problem, and it arrives disguised as progress. WAPE divides total absolute error by total sales. Add distributors, grow volume, and the denominator grows faster than the numerator. Over time, your WAPE values get smaller and smaller, because the denominator is growing larger, which Hyndman names the illusion of improving accuracy (Hyndman, 2025). The condition for the measure to mean anything is strict: The resulting estimate is only consistent when the time series is stationary. A growing business does not have one. Before reporting that accuracy improved, check the naive ratio as well: growth flatters WAPE, but it cannot flatter a comparison made on the same data.

Aggregation does the same work in space that growth does in time. RELEX works an illustration through on one dataset: a MAPE of 3% read at group level, 33% read at product level and then averaged. Both are correct, and the vendor’s own guidance is that they should never be compared directly (RELEX). In our practice the level you measure at moves the number further than the choice of method does.

Four bars run left and right of a zero line, two each way, labelled four products, with 33% beside them as their average. Below, the same errors rolled up give one short bar and 3% on the group total.Two rows. The upper row shows four bars running left and right of a vertical zero line, two in each direction, standing for four products whose forecasts missed in both directions. Their average absolute error is 33 per cent. The lower row shows the same errors rolled up to one group total: a single short bar just right of the zero line, 3 per cent. The bar lengths are illustrative of the cancelling; the two percentages are RELEX’s published pair for one dataset.four products33%their averagerolled up3%group total
Misses in opposite directions cancel on the way up. Nothing about the forecast changed between the two rows; only the level it was read at. The two percentages are RELEX’s published pair for one dataset, and the bar lengths illustrate the cancelling rather than reporting it.
The picture as text

Two rows. The upper row has four bars running left and right of a vertical zero line, two in each direction, standing for four products whose forecasts missed both ways. Their average absolute error is 33 per cent. The lower row has the same errors rolled up into one group total: a single short bar just to the right of the zero line, at 3 per cent.

A worked example: one forecast, three verdicts.

Four months of one item. The figures are assumed, chosen to be awkward rather than typical.

Month Sold Forecast Error
April 100 110 −10
May 120 100 +20
June 0 20 −20
July 400 300 +100
Total 620 530 +90
  • MAE is the four misses added up, 150 units, divided by four months: 37.5 units a month.
  • WAPE is 150 ÷ 620 = 24.2%.
  • MAPE is undefined, because June divides by zero. Drop June and it is 17.2%, the flattering number of the three, produced by deleting the month the forecast got most wrong in proportion.
  • Bias is +90 ÷ 620 = +14.5%. The forecast ran low by a seventh of everything sold.
  • Against the naive forecast, which just repeats last period: over May, June and July the naive misses are 20, 120 and 400, so 540 units against this forecast’s 140. That ratio, the relative absolute error, is 0.26.

Read the first four numbers and the forecast looks mediocre. Read the fifth and it looks outstanding. Nothing changed between those readings. The first four measure the forecast against perfection, which nobody reaches. The fifth measures it against the free alternative, which is the comparison that says whether forecasting was worth doing at all.

Do not take the 0.26 at face value either, though it would look excellent against the 0.5 that the section on what counts as good treats as a practical floor. Three periods is far too short, and one of them is a month that sold nothing followed by a month that sold four times the usual, which inflates what the naive forecast got wrong and flatters the ratio. This example is too small to score, which is itself the lesson: a ratio from a short window is as unreliable as a percentage from one.

Does your error measure change the forecast?

The measure you choose determines which point of the demand distribution an honest forecaster should report. That follows from a result in the literature rather than from practice.

Under squared error, the optimal point forecast is the mean of the predictive distribution. Under absolute error, the Bayes rule is any median of the predictive distribution (Gneiting, Making and Evaluating Point Forecasts, section 1.3). MAE and WAPE are absolute-error measures. Hyndman states the consequence for WAPE directly: optimising the WAPE will lead to the median forecast.

A right-skewed demand curve. A solid line marks the median, near the peak; a dashed line marks the mean, further right, pulled out by the tail. A key says MAE and WAPE aim at the median, RMSE at the mean.A demand distribution drawn as a right-skewed curve: it rises steeply, peaks early and trails off in a long tail to the right. A solid vertical line marks the median, just right of the peak. A dashed vertical line marks the mean, further right, pulled out by the tail. Both positions are computed from the curve as drawn. A key to the right says the median is what mean absolute error and weighted absolute percentage error aim at, and the mean is what root mean squared error aims at.demandmedianMAE and WAPEmeanRMSE
The gap between the two lines is the gap between the two families of measure. On a steady fast mover it is narrow enough to ignore. On a long tail it is not, and the measure you report decides which target your team is paid to hit.
The picture as text

A demand distribution drawn as a right-skewed curve: it rises steeply, peaks early and trails off in a long tail to the right. A solid vertical line marks the median, near the peak. A dashed vertical line marks the mean, further right, pulled out by the tail. A key to the right says the median is what mean absolute error and weighted absolute percentage error aim at, and the mean is what root mean squared error aims at.

For a fast-moving item whose demand is roughly symmetric, the mean and the median sit close together and nothing much turns on it. For a long tail of slow movers, demand is skewed and the median can be well below the mean. Sometimes it is zero. Score a planning team on WAPE across a catalogue like that, and the error-minimising behaviour is to forecast low on exactly the items where a stockout is most likely.

Gneiting’s prescription is to decide first: Effective point forecasting requires that the scoring function be specified a priori (Gneiting). In practice that means writing down, before the trial, that you will score on WAPE at the order horizon, on items that sell in most periods, and watch bias beside it, rather than picking the measure that flatters the result afterwards. Where a stockout genuinely costs more than overstock, the clean way to say so is a quantile loss, which lets you weight under-forecasting more heavily instead of correcting a symmetric measure after the fact (FPP3).

How do you test a forecast honestly?

An error computed on the months a method was fitted to is not an error, it is a memory. A model which fits the training data well will not necessarily forecast well (FPP3, 5.8), and the residuals of a fitted model are smaller, as the corresponding “forecasts” are based on a model fitted to the entire data set (FPP3).

The procedure is to hold back a period, fit on everything before it, score on the held-back period, then move that cut-off forward one period and repeat, so one lucky window cannot decide the result. The textbook name is time series cross-validation, also given as evaluation on a rolling forecasting origin, in which each test set is a single period (FPP3).

Three rows of twelve squares. Earlier squares are shaded as the periods fitted on, the next is solid as the period scored on, the rest empty. The solid square moves one step later each row.Three rows of twelve squares, each row one period per square. In the first row the first eight squares are shaded as the periods the method was fitted on, the ninth is solid as the single period it was scored on, and the rest are empty. The second row fits on nine and scores on the tenth. The third fits on ten and scores on the eleventh. The cut-off between the fitted periods and the scored one moves forward one period each pass, so no single window decides the result.fit on thesescore on thisthen move the cut-off and repeat
One pass can be lucky. Moving the cut-off and scoring again is what stops a single good month deciding which method you adopt.
The picture as text

Three rows of twelve squares, one period per square. In the first row the first eight squares are shaded as the periods the method was fitted on, the ninth is solid as the single period it was scored on, and the rest are empty. The second row fits on nine and scores on the tenth. The third fits on ten and scores on the eleventh. The cut-off moves forward one period each pass.

Two things fall out of doing it properly. Error grows with distance, so the number that matters is the error at the horizon you order on, not next month’s. And a range can be checked: count how often sales landed inside it, then widen or narrow until the count matches the claim. Too narrow looks confident and runs you out of stock; too wide ties up cash. The two properties are called calibration and sharpness, and a good forecast has both (Gneiting, Balabdaoui and Raftery, 2007). How wide that range is, is what sets your safety stock, which we work through in inventory control.

What counts as a good forecast error?

Not against an industry average. The most traceable cross-industry benchmark we found comes from the Lancaster Centre for Forecasting, which surveyed 265 professionals in 2012 and published self-reported MAPE from an analysis sample of 200 manufacturers, mostly in consumer goods. Its own caveats are the interesting part: 59 of those 200 answered no accuracy question at all, and the individual figures in its table rest on as few as 48 replies (Weller and Crone).

They also note that a number of respondents appear to have reported their forecast accuracy rather than their forecast error, and say the figures need validating with respondents before anyone can judge how reliable they are (Weller and Crone, 2012). A review of the published surveys reaches the same verdict generally: none of the published sales forecasting studies can be used as a benchmark. (Foresight)

What works is a comparison against doing nothing. Score your forecast against the naive one, which repeats the last period it could have seen, and take the ratio. If you order three months ahead, that is the month sold three months before the target, not last month. The ratio has a name: the relative absolute error, or RAE, your total absolute error over the naive forecast’s, on the same items, lag and level. At 1.0 you have matched doing nothing.

Steve Morlidge’s collected work in Foresight sets the two ends. The naive forecast is the ceiling: The upper bound is defined by the naive forecast itself. The floor differs by measure, an unavoidability ratio of 0.5 in terms of MSE or 0.7 with respect to the MAE, and in practice an RAE < 0.5 is so rare that 0.5 can be considered a practical lower bound (Morlidge).

A scale of relative absolute error from 0 to 1.2. A pale band marks the floor, 0.5 to 0.7. A heavy line at 1.0 is the naive forecast. A darker band, the medians of eight firms, straddles it.A horizontal scale of relative absolute error from 0 to 1.2. A pale band between 0.5 and 0.7 is marked as the floor: 0.5 is a practical lower bound and 0.7 the theoretical unavoidability ratio in mean absolute error terms. A heavier vertical line at 1.0 marks the naive forecast, so anything to its right is worse than repeating last period. A darker band spans 0.94 to 1.06, with a dot at the average of 1.02, marking the range of median performance across eight businesses. That darker band straddles the naive line, so half of it lies in the worse-than-naive region.00.20.40.60.81.01.2naive forecastfloor 0.5 to 0.7eight firms’ mediansrelative absolute error
The whole achievable range is narrow, and the firms’ own band sits astride the line that marks doing nothing. Floors from Morlidge’s 2013 and 2014 articles; the firms’ band from his nine-sample study of eight businesses.
The scale as text

A horizontal scale of relative absolute error running from 0 to 1.2. A floor region is shaded between 0.5, described as a practical lower bound because an RAE below it is rare, and 0.7, the theoretical unavoidability ratio in mean-absolute-error terms. A line at 1.0 marks the naive forecast: anything to the right of it is worse than repeating last period. A darker band spanning 0.94 to 1.06 marks the range of median company performance across the eight businesses studied, with the average at 1.02, which sits to the right of the naive line.

So the achievable band is roughly 0.5 to 1.0. Where do real businesses sit in it? In nine sets of supply-chain forecasts from eight businesses, covering around 17,500 products and a third of a million data points, 52% of the forecasts in our overall sample had RAEs above 1.0. More than half were worse than repeating last period, and the typical company sat on the line rather than inside it: The median RAE for each company was in the range 0.94 to 1.06 with an average of 1.02. (Morlidge)

Quote that 52% with its sample attached: the same collection carries other figures from other samples, including about 40% from an 11,000-item example (Morlidge).

The finding that should change your reporting is this one: There is essentially no correspondence between RAE and forecast accuracy (or MAPE). (Morlidge) A high accuracy percentage tells you nothing about whether the forecast is beating a free alternative. The two numbers are close to unrelated. That is the general case against single-figure reporting, which we make for the rest of the measures in the supply chain KPIs that actually matter.

Measuring forecast error on an Indian sales history.

Before any of the above applies, the history has to be worth measuring on, and in India it usually needs work first.

The invoice record is reliably money, not reliably units. India’s notified e-invoice schema makes HSN code, unit price and taxable value mandatory at item level, while item description, unit of measurement and quantity are optional. Quantity carries one condition: The quantity of items to be mentioned in the invoice. This is mandatory only in case of goods. (Notification 60/2020-Central Tax) The unit carries no such condition, so a quantity with no unit is valid.

So an invoice history gives you rupees and a tax class reliably, and SKUs in consistent units only if someone kept them clean. It is the same data problem that decides whether a spreadsheet is still the right home for your planning. The threshold for mandatory e-invoicing was cut to five crore rupees of turnover from 1 August 2023 (Notification 10/2023-Central Tax); check it is still current before you lean on it.

The standard export drops part of your sales. Tally’s documentation states that The Export for Pivot Table will extract the data of only those Sales vouchers having Inventory allocated. (Tally) Sales vouchers without inventory, such as services and accounting-only entries, are left out, and the formats on offer are text, Excel, HTML, JPEG, PDF, XML and JSON (Tally), so your history starts life in a spreadsheet.

Policy puts holes in the series. Around the September 2025 rate changes, a distributor in the west told Business Standard that buying had slowed down and also halted for around four to five days ahead of the implementation of the new GST rates. The same account adds that primary sales (sales from companies to distributors) have picked up since September 22 while the same recovery has not been seen from retailers. (Business Standard, 29 September 2025) That is a trough and a recovery in your sell-in history that are not demand. Mark those months before you score anything on them.

And the obvious fix is not settled. The instinct is that sell-out is the real demand signal and sell-in a distortion of it, so you should forecast from the former. The evidence is split. On one Australian food manufacturer’s 684 product-location series over 112 weeks, the order-based methods outperform the POS-based ones by 6%-15% (Abolghasemi, Rostami-Tabar and Syntetos, 2022).

On 50 items at a US pharmaceutical manufacturer, methods that used wholesaler sell-through, including ones that substituted it for the manufacturer’s own history, came out best, about 7% more accurate on average than the best method without it (Van Belle, Guns and Verbeke, 2019). Two companies, opposite answers. Test both series on your own history before you switch, say which series your number is on, and stay on it.

When not to measure forecast error at all.

Everything above assumes demand that occurs in most periods. Where it does not, the advice does not apply, and for a slow-moving catalogue the honest answer is that the forecast is the wrong object to measure at all.

Teunter and Duncan tested the usual methods on 5,000 consumable spare-part items from the UK Royal Air Force over six years. Their conclusion is flat: the traditional per period forecast error measures are not appropriate for intermittent demand. The demonstration is better than the argument. The main, and striking, result is that the Zero Forecast comes out as the best of all the methods on MAD and on squared-error measures (Teunter and Duncan). Forecasting plain zero wins, because those measures penalise a method for correctly predicting that something will sell.

This is not an artefact of one dataset. A simulation study reaches the same place: We argue that almost all known measures rank forecasters incorrectly on intermittent demand series, naming MAE, MdAE and iMAPE among the unreliable ones (Prestwich and colleagues, 2013). Simulated series are weaker evidence than a real catalogue, and useful here precisely because they isolate the measure from any quirk of the data.

Nobody is recommending you forecast zero. The same paper records the limit, citing the original authors: ZF is of no practical use for inventory control. A measure that crowns it is not measuring anything you want. What to do instead is specific: Teunter and Duncan rank methods by comparing target service levels to actual service levels. Judge the outcome the stock was bought for, not the forecast that sized it. We work that through for slow movers.

What to ask of any forecast.

Whoever produces it, including us, five questions separate a useful forecast from a decorative one.

  1. Was it tested on periods it never saw, from more than one starting point?
  2. What is the error at the horizon you order on, rather than at one month?
  3. Which way does it lean, and how far? Ask for bias as a signed number, not an accuracy percentage.
  4. What did the naive forecast score on the same items, the same lag and the same level? If nobody ran it, the comparison that matters is missing.
  5. What is the formula? Not the acronym. WMAPE, wMAPE, MAD/Mean and WAPE are the same thing, and MAPE is sometimes that thing too.

scimin sells planning software and services, so apply all five to us, and to anyone you are evaluating planning software against. If the answers are not written next to the numbers, the numbers are a guess with a decimal point.

For the person above you who wants one number, send one line instead, and keep its shape the same every month. An illustrative line: sell-in, units; WAPE 24% at SKU-location level, three-month lag, on items that sell in most months; bias +4%, meaning the forecast ran low; 0.82 of the naive forecast’s error at the same lag. Each part can be checked against last month’s line, which a bare percentage cannot.

FAQ.

Should I use MAPE or WAPE? WAPE, on items that sell in most periods, if you want one percentage, because it survives periods with no demand. Report mean absolute error in units beside it and bias beside that, and run the naive forecast on the same data so you know what the percentage is worth. One number cannot carry direction, and direction is what costs money.

Our system reports RMSE. Is that wrong? No, but know what you are asking for. Squared error rewards forecasting the mean; absolute error rewards the median. On steady fast movers the two sit close together. On a long tail they diverge, and RMSE is the one that will not quietly pull your forecasts toward zero.

At what level should we measure, SKU or category? At the level the decision is taken. If you order by SKU and location, a category-level figure says nothing about whether the order was right, and it will always look better. Report the level beside the number or the number compares with nothing, including last quarter’s.

Sources.

27 references

Every page cited above, in the order it first appears. The research files list every page opened, including those that could not be reached.

Published by scimin, a product of Pralok Enterprise, Mumbai. scimin sells supply chain planning software and services. This guide was researched and drafted with AI assistance, and every figure links to the page it was checked against. Spot an error? Tell us and we will correct it with a dated note. How we write and check our articles.

See it in the product: demand forecasting for pharmaceuticals, demand forecasting for grocery and fresh retail and how the forecast is built.

Talk to us about measuring your forecast.

Related articles.