The picture as text
A row of twenty-six periods for one item. Eighteen periods sold nothing and are marked by faint stubs on the baseline. Eight periods carried an order, drawn as bars of differing heights. A horizontal line across the chart is the stock held. Seven of the bars stay below the line and each has a tick above it, meaning the order was filled. One bar rises above the line and is marked with a ring, meaning that order could not be filled in full.
Slow-moving inventory is stock whose demand comes rarely, and often in lumps: spare parts, MRO items, slow pack sizes. Planning it takes five steps. Sort the tail by how often and how unevenly items sell. Forecast with the Syntetos-Boylan approximation (SBA), one smoothing value for the lot. Size stock from simulated lead-time demand, judge it by orders filled from stock, and freeze re-buying of items with one order or none in two years, other than vital and insurance spares, until someone reviews them.
On this page
What is slow-moving inventory?
Slow-moving inventory is stock with long gaps between orders, often with uneven order sizes as well, and two numbers place each item. One is the average gap between periods with demand: an item that sells every month has a gap of one, an item that sells every third month a gap of three. The other is how much order sizes vary when orders do come, usually measured as the squared coefficient of variation (CV²): the spread of order sizes relative to their average, squared.
Syntetos, Boylan and Croston (2005) used those two numbers to split items into four classes, as an aid to choosing a forecasting method. Smooth items sell often in steady sizes. Erratic items sell often in uneven sizes. Intermittent items sell rarely in steady sizes. Lumpy items sell rarely and unevenly. The cut-offs usually quoted are a gap of 1.32 periods and a CV² of 0.49 (Kostenko and Hyndman, 2006). The slow movers are the two long-gap classes, intermittent and lumpy.
The classes as text
Two axes. Across: the average gap between periods with demand. Up: the squared coefficient of variation of order sizes. A vertical line at a gap of 1.32 and a horizontal line at a variation of 0.49 divide the plot into four classes: smooth (short gaps, steady sizes), erratic (short gaps, uneven sizes), intermittent (long gaps, steady sizes) and lumpy (long gaps, uneven sizes). The two long-gap classes on the right are shaded.
Kostenko and Hyndman reworked the scheme, put the limits at 4/3 and 0.5, and proposed a diagonal boundary in place of the rectangle. They also found that across most of the region where the original scheme picks Croston’s method, its corrected form is the more accurate (Kostenko and Hyndman, 2006).
At the main spare-parts warehouse of a large European white-goods maker, more than half of about 90,000 SKUs had not sold once in the previous five years (Bacchetti, Plebani, Saccani and Syntetos, working paper 408/12). Of Walmart’s 30,490 product-store series in the M5 forecasting competition, 73.35% were intermittent and 17.01% lumpy, in the same four classes; the paper does not print its cut-offs (Theodorou and colleagues, 2021).
How do you forecast intermittent demand?
Our default for slow movers is SBA with one smoothing value shared across items, and the evidence behind that choice is mixed. Demand with gaps has two parts: whether an order comes at all, and how big it is when it does. Croston’s method forecasts the two separately, smoothing the order sizes and the gaps between them (Hyndman, forecast package documentation), and takes the ratio of the two as the demand per period. Teunter and Duncan found Croston-type methods gave clearly better service than general methods such as moving averages on 5,000 Royal Air Force spare parts (Teunter and Duncan, 2006).
The chart as text
Orders arrive in eight of twenty-six months, in sizes from three to eleven units. A three-month moving average peaks at 5 units a month after two orders in a row and falls to zero after three empty months. SBA, started at the first order, stays between about 1.7 and 2.0 units a month throughout.
Croston’s method has two known faults. It runs high: Teunter, Syntetos and Babai, who proposed the TSB method, show it is positively biased at every point in time (Teunter, Syntetos and Babai, 2011). SBA corrects that by multiplying Croston’s forecast by one minus half the smoothing value, so by 0.95 at a value of 0.1 (Syntetos and Boylan, 2006). On 3,000 automotive series it beat Croston’s and two general methods on forecast accuracy (Syntetos and Boylan, 2005). Croston’s method also cannot see an item fading, because it does not update in a period with no sale; TSB updates the chance of an order every period, so its forecast falls as an item dies (Teunter, Syntetos and Babai, 2011).
On 3,055 electronics spare parts and 4,076 jewellery SKUs, simple parametric methods of this kind performed well, and bootstrapping was of doubtful value for its extra complexity (Syntetos, Babai and Gardner, 2015).
To compute SBA, keep two numbers per item. In a month with an order of d units, q months after the last one, set size = size + 0.1 × (d − size) and gap = gap + 0.1 × (q − gap); in a month with no order, leave both. Start them at the first order’s size and the months up to it. The forecast per month is 0.95 × size ÷ gap (the 0.95 is the correction above, from Syntetos and Boylan, 2006).
On stock, the evidence is split. Syntetos and Boylan found their corrected method gave the best stock-control performance on 3,000 SKUs (Syntetos and Boylan, 2006), and Kingsman and Eaves reported significant stock-holding reductions from it on RAF consumable spares (Kingsman and Eaves, 2004). On other RAF data, though, original Croston gave the best inventory results in Babai, Syntetos and Teunter’s study, and Teunter and Duncan recommend it with a corrected order-up-to calculation (Babai, Syntetos and Teunter, 2014; Teunter and Duncan, 2006). We keep SBA because Croston’s upward bias buys stock you then have to justify; with a year of history, replay both on a class and keep whichever hit the target with less stock. This evidence does not justify switching fading items to TSB.
In our reading, the fitting matters more than the choice. Babai, Syntetos and Teunter tuned the smoothing value item by item and did worse than with one value shared across all items, because there simply is not enough data available at the SKU level
(Babai, Syntetos and Teunter, 2014).
Start low: the R package’s Croston function defaults to 0.1 (Hyndman, forecast package documentation). On 3,000 automotive spare-parts series, fitting the value by squared or absolute forecast error pushed it well above the 0.05 to 0.3 that earlier studies recommend. Fitting each series to a rate-based error measure beat fixed values for Croston and TSB and only matched them for SBA (Kourentzes, 2014). So the usual squared and absolute errors are the wrong yardstick, and for SBA a shared value cost nothing in accuracy; separate values for size and gap also helped.
If you tune at all, run the simulation below at 0.05, 0.1 and 0.2 against last year’s orders for a whole class, and keep the value that hit the service target with the least stock.
Machine-learning methods trained across many items can do better, though in our view they need volume and upkeep. In the M5 competition on Walmart’s 30,490 product-store series, the winning entry beat Croston’s method by 45.6% averaged across twelve levels of aggregation, but by only about 5% for single products in single stores, where the authors judged Croston-type methods still hold some value (Makridakis, Spiliotis and Assimakopoulos, 2020).
Why is forecast error the wrong scorecard for slow movers?
Forecast error is the wrong scorecard because on a slow mover a forecast of zero can score best on the usual error measures. On the 5,000 Royal Air Force parts, a forecast of zero beat every real method on per-period error, and on service level it was the worst of them all: Zero Forecast is definitely the worst method
(Teunter and Duncan, 2006). We work through why error measures fail on gaps in how to measure forecast error, and the wider causes in why supply chain forecasts fail.
How do you measure service level and fill rate on spare parts?
Judge a slow mover by the service it achieved against its target, read beside the stock it took.
Count the achieved figure; on real spare parts it drifts from the target typed into the software. On the 3,055 electronics spares, simple exponential smoothing set to a 99% target delivered 95%, and at the 95% and 99% targets all methods significantly underperform
(Syntetos, Babai and Gardner, 2015). In a study of 2,971 automotive spare parts with 24 months of history, three methods including SBA met cycle service targets of 85% and 90% but not 95% (Babai, Chen, Syntetos and Lengu, 2021).
Fill rate is the share of demand met from stock, and cycle service level (CSL) the share of replenishment cycles with no stockout (Conceição and colleagues, 2015). How we count them from order lines:
- Order-line fill rate: order lines shipped complete from stock on the day asked for, over order lines received. This is the “orders filled” in our opening, and the one a customer feels.
- Unit fill rate: units shipped from stock on the day asked for, over units ordered. One large missed order drags it down far more than it drags down the line count.
- Cycle service level: a cycle runs from one receipt to the next; count it as a stockout if any order line in it was short-shipped.
Set the target by consequence. Our suggested starting point, if you already sort parts as vital, essential and desirable (VED analysis): CSL targets of 99%, 95% and 90%, then adjust by what each point costs. Size stock to the CSL target, because a percentile of lead-time demand gives exactly that, and report order-line fill rate beside it; if the line count falls short, raise that class’s target. Our rule of thumb: when a class’s order-line fill rate over 12 months runs more than five points below its CSL target, move the class up a step. On the illustrative item below, moving from 90% to 99% takes stock from 8 units to 14, 75% more.
How much safety stock does a slow mover need?
A slow mover needs enough stock to cover what could be asked for over the lead time plus the time between reviews, sized on the lumps. The usual reorder-point formula, the average plus a safety stock of so many standard deviations, assumes demand is roughly bell-shaped. A slow mover’s demand is mostly zeros with an occasional large order.
A worked example: one lumpy item.
An illustrative item, with assumed numbers. In any month an order arrives with a one-in-five chance, for between 1 and 10 units, each equally likely. Replenishment takes two months, stock is reviewed continuously, and it is topped up to the same level at the start of each lead time. Over a lead time, demand averages 2.2 units with a standard deviation of 3.6, and in 64% of lead times nothing is asked for at all.
| CSL target | Bell curve (units) | CSL that stock achieves | Exact need (units) |
|---|---|---|---|
| 90% | 7 | 87.2% | 8 |
| 95% | 9 | 94.2% | 10 |
| 99% | 11 | 98.2% | 14 |
The bell-curve figures are the mean plus the normal multiple of the standard deviation, rounded up to whole units. They fall short at every target, by 1, 1 and 3 units. At 90%, the 8 units needed are 2.2 of expected demand plus about 6 of safety stock.
The chart as text
At a 90% target the bell-curve stock runs out in 12.8% of lead times against 10% intended, 1.28 times as often. At 95%, 5.8% against 5%, 1.15 times. At 99%, 1.8% against 1%, 1.80 times.
Say which service measure you mean, because CSL and fill rate need not agree. On 338 high-value MRO spares at a steelmaker, most of them intermittent or slow-moving, Conceição and colleagues found fill rate above the service level they measured for every model they tested (Conceição and colleagues, 2015). On our item it can come out below. At the 90% stock of eight units, CSL and unit fill rate are close, 90.7% and 89.2%, but only 74.8% of order lines are filled complete, counting an order as unfilled if stock cannot cover it in full. CSL counts the 64% of lead times with no order as successes, so on a slow mover it reads high; that is why the order-line count belongs beside it.
Data behind the chart
| Units stocked | CSL (%) | Unit fill (%) | Order lines (%) |
|---|---|---|---|
| 2 | 70.4 | 31.3 | 18.1 |
| 4 | 77.0 | 56.7 | 36.6 |
| 6 | 83.8 | 76.0 | 55.5 |
| 8 | 90.7 | 89.2 | 74.8 |
| 10 | 97.8 | 96.0 | 94.5 |
| 12 | 98.6 | 97.8 | 96.4 |
| 14 | 99.2 | 99.0 | 97.9 |
Doing the calculation in a spreadsheet.
For an item with a long history, about 100 past lead-plus-review windows or more, add up the demand in each and take the percentile you need. Two years of monthly data gives only about two dozen windows, too few for an item with a handful of orders. Simulate those instead:
- Make one row per simulated lead-plus-review window, and one cell per month in it.
- In each cell put
=IF(RAND()<p, INDEX(sizes, RANDBETWEEN(1, n)), 0). Take p as 0.95 divided by SBA’s smoothed gap, which keeps the correction, and sizes as the item’s past order sizes, scaled so their average matches SBA’s smoothed size; n is how many sizes there are. For items with fewer than about five past orders, borrow the sizes of their class or the part they replace. - Sum each row, fill 5,000 rows, and paste the sums as values, because
RAND()recalculates on every edit. - Take
PERCENTILE.INCof the sums at the target, and recompute after each new order. SBA does not move in months without one, so a fading item’s stock will not fall on its own; the freeze rule below is what catches it.
In our view, software (scimin sells it) earns its cost when there are thousands of items or lead times that vary, and whether a tool does this calculation is a fair test when choosing planning software. For items that sell steadily, see reorder points and safety stock in inventory control.
Should sites share slow stock?
In our reading, sharing slow stock across sites pays mainly when a transfer is quick, well inside the replenishment lead time. In Kukreja, Schmidt and Miller’s model of a utility’s 29 power plants, with stock set to allow for transfers, total system cost could be reduced by about 70%
against site-by-site stocking (Kukreja, Schmidt and Miller, 2001). In Yang and Dekker’s model of one part at three service centres, on figures changed for confidentiality, slow transfers raised the computed annual cost from 26,077 euros to 26,743, about 2.6% (Yang and Dekker, 2010). Where stock should sit across a network is covered in planning the network as one problem.
When to stop stocking a slow-moving item.
Stop when the item’s own order history says it is dying, and decide before the next purchase order. In one manufacturer’s service-parts data, parts were grouped by their orders in a period of just under two years, then checked over a two-year window that began about a year later. Of 5,630 parts ordered once, 57.5% had no demand at all in that window. Of 1,664 parts ordered ten or more times, 0.2% had none (van Jaarsveld and Dekker, 2010). The authors caution that no demand does not necessarily mean a part is obsolete, so treat a single order as the place to look first.
Share of parts with no demand in a later two-year window
We freeze replenishment on any item with one order or none in the last 24 months until someone decides to keep or retire it. Parts classed as vital, insurance spares, spares for equipment still in service and items out of stock for much of the window are flagged for review instead of frozen.
Retiring means deciding what happens to the stock on hand. Return it to the supplier if the contract allows, sell it, move it to a site that still uses it, or scrap it, and write it down in the same year. When a part number is superseded, carry the old number’s history to the new one, or the new part starts life looking as if it has never sold.
Dead stock in Indian accounts and audits.
Indian accounting tests slow stock, usually line by line, every year it sits. Listed companies (other than those on SME exchanges) and larger unlisted ones follow Ind AS by ICAI’s summary of the roadmap; others may adopt it voluntarily, banks, NBFCs and insurers have their own roadmaps, and the rest stay on the older Accounting Standards (ICAI, Ind AS overview, 2016).
Under Ind AS 2, inventory sits at the lower of cost and net realisable value, reassessed every period, with obsolescence a named reason cost may not be recovered; write-downs are usually item by item, expensed in the period, and reversed, up to the amount written down, if the value recovers (Ind AS 2, as amended to 2018). AS 2 likewise writes down item by item, assessed at each balance sheet date (ICAI, AS 2, revised 2016). Hand finance the freeze list before the year-end close.
The Comptroller and Auditor General’s report on the Indian Navy shows the problem running both ways at once. At 31 March 2016, items that had not moved in five years made up between 54% and 98.29% of the item records held across the Navy’s material organisations, and ₹7,359.37 crore of stock sat above upper stock levels. Yet the audit’s site tables at 30 November 2015 list thousands of vital and essential items below minimum stock (CAG Report No. 20 of 2017).
One site bought four magnetrons for ₹3 crore while another had held twelve since the year before. The audit noted that the Navy’s inventory system could show an item’s stock position across its material organisations, though it was not yet integrated across all commands and dockyards (CAG Report No. 20 of 2017). In our view, the cheapest fix in that story is a rule that every purchase first checks what other sites already hold.
When this advice does not apply.
Where demand can be known in advance, plan from that: spares for planned maintenance from the maintenance schedule, and parts for a customer’s committed project from the order book. Insurance spares, held against a rare breakdown of a critical machine, are a decision about risk, so set their stock by the cost of the breakdown and leave the freeze rule out of it. Items that look slow only because they were out of stock have sales history that understates demand: the gaps are yours, not the customer’s. These exceptions are our practice; the studies above do not test them.
What to do this month.
- Sort the tail. Use two years of monthly buckets: gap = months ÷ months with demand, and CV² = (STDEV.P ÷ AVERAGE)² of the months with demand. Put each item in one of the four classes; items with one order or none go straight to the freeze review.
- Give the slow classes SBA and one smoothing value. Start at 0.1, and change it, if at all, for the whole class, judged on service and stock.
- Size their stock on the lumps. Simulate lead-time demand for items with few orders, or take a percentile of past lead-time demand for items with a long history, and stop using the bell-curve formula on them.
- Set CSL targets by consequence, and count what was filled. Report order-line fill rate beside CSL by class, with the stock value it took.
- Freeze the dying. Stop re-buying any item with one order or none in 24 months until someone decides to keep or retire it; flag vital parts, insurance spares, in-service spares and items out of stock for much of the window instead of freezing them. Before any purchase, check what other sites hold.
Any tool you evaluate, including the planning software scimin sells, should let you do these five things.
FAQ.
Is ABC, FSN or VED classification enough?
None of them alone. ABC sorts items by value, FSN by how fast they move and VED by how critical they are; the two-number scheme sorts them by how they sell. Value sets what service you can afford, criticality sets the target, and the selling pattern sets how to plan.
Sources.
24 references
Every page cited above, in the order it first appears.
- On the categorization of demand patterns Syntetos, Boylan and Croston; Journal of the Operational Research Society 56(5), 495–503, 2005 (abstract record)
- A note on the categorization of demand patterns Kostenko and Hyndman; Journal of the Operational Research Society 57, 1256–1257, 2006
- Spare parts classification and inventory management: a case study Bacchetti, Plebani, Saccani and Syntetos; Salford Business School working paper 408/12
- Exploring the representativeness of the M5 competition data Theodorou, Wang, Kang, Spiliotis, Makridakis and Assimakopoulos; arXiv 2103.02941, 2021; journal version International Journal of Forecasting 38(4), 2022
- croston {forecast} R documentation Hyndman; R forecast package documentation, CRAN
- Forecasting intermittent demand Teunter and Duncan; Lancaster University Management School working paper 2006/027, January 2006 (published in the Journal of the Operational Research Society 60(3), 2009)
- Intermittent demand: Linking forecasting to inventory obsolescence Teunter, Syntetos and Babai; European Journal of Operational Research 214, 2011 (abstract record)
- Comments on the attribution of an intermittent demand estimator Syntetos and Boylan; International Journal of Forecasting 22(1), 2006 (abstract record)
- The accuracy of intermittent demand estimates Syntetos and Boylan; International Journal of Forecasting 21(2), 303–314, 2005 (abstract record)
- Forecasting intermittent inventory demands: simple parametric methods vs. bootstrapping Syntetos, Babai and Gardner; Journal of Business Research 68, 1746–1752, 2015
- On the stock control performance of intermittent demand estimators Syntetos and Boylan; International Journal of Production Economics 103(1), 36–47, 2006 (abstract record)
- Forecasting for the ordering and stock-holding of spare parts Kingsman and Eaves (as printed on the record); Journal of the Operational Research Society 55(4), 431–437, 2004 (abstract record)
- Intermittent demand forecasting: an empirical study on accuracy and the risk of obsolescence Babai, Syntetos and Teunter; International Journal of Production Economics 157, 212–219, 2014 (accepted manuscript)
- On Intermittent Demand Model Optimisation and Selection (working paper) Kourentzes; Lancaster University Management School working paper, 17 March 2014
- The M5 Accuracy competition: Results, findings and conclusions Makridakis, Spiliotis and Assimakopoulos; preprint, October 2020, published in International Journal of Forecasting 38(4), 1346–1364, 2022
- A compound-Poisson Bayesian approach for spare parts inventory forecasting Babai, Chen, Syntetos and Lengu; International Journal of Production Economics 232, 107954, 2021 (accepted manuscript)
- A demand classification scheme for spare part inventory model subject to stochastic demand and lead time Conceição and colleagues; Production Planning & Control, 2015 (accepted manuscript)
- Stocking Decisions for Low-Usage Items in a Multilocation Inventory System Kukreja, Schmidt and Miller; Management Science 47(10), 1371–1383, 2001 (abstract record)
- Service Parts Inventory Control with Lateral Transshipment that Takes Time Yang and Dekker; Tinbergen Institute discussion paper TI 2010-025/4, revised 26 February 2010
- Estimating obsolescence risk from demand data - a case study van Jaarsveld and Dekker; Econometric Institute report EI 2010-03, 18 January 2010
- Indian Accounting Standards (Ind AS): An Overview (Revised 2016) The Institute of Chartered Accountants of India; revised edition, August 2016
- Indian Accounting Standard (Ind AS) 2, Inventories Text of Ind AS 2, as amended to 2018, published by the ICAI Navi Mumbai branch
- Accounting Standard (AS) 2, Valuation of Inventories (revised 2016) The Institute of Chartered Accountants of India; notified under the Companies (Accounting Standards) Rules, 2021
- Chapter 2: Performance audit on the inventory management of naval stores, equipment and spare parts in Indian Navy (Report No. 20 of 2017) Comptroller and Auditor General of India; Report No. 20 of 2017, Chapter II (data as of 31 March 2016)
Published by scimin, a product of Pralok Enterprise, Mumbai. scimin sells supply chain planning software and services. This guide was researched and drafted with AI assistance. Every sourced figure links to the page it was checked against, and the worked example is our own calculation, with its assumptions stated. Spot an error? Tell us and we will correct it with a dated note. How we write and check our articles.
See it in the product: demand forecasting for automotive spares, demand forecasting for industrial MRO spares and how the forecast is built.