A diagram with four rows, one per input. Each row has two horizontal bars: an upper bar for time-to-survive, how long the firm can keep serving customers without that input, and a lower bar for time-to-recover, how long the input would take to come back. In the first row survival is much longer than recovery and the row is marked fine. In the second and third rows the survival bar is shorter than the recovery bar and the rows are marked exposed, with the shortfall bracketed. In the fourth row the two are close and the row is marked watch. The comparison, not the probability of any disruption, is what identifies the exposure.
How can a mid-size firm make its supply chain more resilient?
Ask two questions about each input you cannot easily replace. How long would it take to come back if that supplier stopped? And how long could you keep serving customers without it? Where the second number is smaller than the first, you are exposed. Where it is larger, you are not. That is the method, and the reason to prefer it is that ranking your exposure this way needs no estimate of how likely anything is. Deciding what to spend on the exposures it finds is a separate judgement, and that one does eventually involve weighing likelihood: the published wording is that the approach defers the probability question rather than removing it.
The published names are time-to-recover and time-to-survive. They come out of work at MIT with Ford, and the definitions are worth having exactly. Time-to-survive is the maximum amount of time the system can function without performance loss if a particular node is disrupted
. Time-to-recover is the time it takes for a node to recover to full functionality after a disruption
(Simchi-Levi et al.).
Nothing in either requires knowing the odds.
On this page
1. Why the usual approach asks for something you do not have.
Conventional risk assessment starts by scoring likelihood against impact. The authors of this method say plainly why that fails for the disruptions that actually hurt: Traditional operational-disruption risk-assessment methods oblige firms to identify the probability and magnitude
of each risk, and First, it is difficult and often impossible for managers to accurately estimate the likelihood of low-probability,
high-impact events. Managers, the authors add, and distrust or disregard precise probability estimates (Kunreuther 1976, March and Shapira 1987).
(Simchi-Levi et al.)
So, in their words, Our approach defers the need for a company to estimate the probability associated with any specific disruption risk until
later in the analysis, which reduces the need to estimate the likelihood of low-probability, high-impact events.
(Simchi-Levi et al.)
This is why the method suits a firm without a risk function. You are not being asked to forecast earthquakes. You are being asked two operational questions that your own planners and your own suppliers can answer.
One honesty note, because the literature moved on: a later paper co-authored by Simchi-Levi puts probability back in, measuring resilience through the worst-case conditional value at risk of lost sales. The probability-free version is the one a mid-size firm can run unaided, and it is the one described here.
2. What the method found when it was run at scale.
Ford applied it across its supply base. The numbers are worth sitting with, because they say something counterintuitive about risk registers.
Ford’s tier 1 at the time: Its Tier 1 suppliers number 1,400 companies across 4,400 manufacturing sites.
, against over $80 billion annually in external procurement
and 130,000 unique parts, 35 billion total parts annually
(Simchi-Levi et al.).
Then the result: Among 4,534 sites examined, 2,773 sites have zero impact at the time of analysis
, while more than 400 sites have very high PIs.
and a disruption at one of those would adversely impact its revenue by up to $2.5 billion
. Across the newly identified high-impact sites, the two-week impact ranges from several hundred thousand dollars to $2.5 billion
(Simchi-Levi et al.). Two notes on those counts: the figures come from a chart caption rather than the text, and the model run covered critical suppliers and Ford’s own plants together, so the denominator is not purely a tier-1 site count.
Sixty-one percent of the sites examined had no impact at all. Not low impact: none, because the model found enough slack somewhere to absorb losing them. The paper reports the count without attributing a cause, so do not read that as “they all held enough stock”. Meanwhile a few hundred sites carried almost all the exposure, and some of them were small suppliers of cheap parts that no spend-based ranking would ever surface.
That is the practical case for the method at any size. A risk register sorted by spend tells you who you pay the most. This tells you who can stop you, which is a different list.
3. Where a recovery number actually comes from.
The obvious objection: how would I know the recovery time? Three answers, in increasing order of effort.
Ask the supplier. In the published formulation the recovery time is an input reported by the supply node, not something the buyer computes: The time-to-recover (TTR) reported by vendor node i;
(Simchi-Levi and co-authors). Asking a supplier how long they would need to restore supply after losing a plant is a reasonable question, and the answer, including a refusal to answer, is information.
Use lead time as a proxy. A 2021 MIT master’s thesis proposes exactly this: We also introduce an alternative TTR based on the weighted average lead time from a disrupted node to a distribution center.
(Xu, MIT) You already know your lead times. It is a rough proxy and it is free.
Check it against the record, which is the part most firms skip, and where the numbers are sobering.
Days to resume operations after the 2011 Thailand floods
Those are measured outcomes from the 2011 Thailand floods: Nissan resumed in 29 days
, Toyota required 42 days to resume operations
, Western Digital partly restored the production after 46 days of stoppage
, and Honda, whose factory at Ayutthaya was inundated, required 174 days to resume its production cycle
(Haraguchi and Lall).
Now set that against what firms plan for. A 2010 survey of 310 resilience professionals across 35 countries, sponsored by the insurer Zurich, found that 24 hours is the typical period within which businesses look to recover critical activities.
and that One week was generally the longest period that respondents had considered in their planning.
(Business Continuity Institute)
One week, against a record of 29 to 174 days.
Two honest caveats, because the comparison is not like-for-like. That survey is from 2010 and self-selected, and, more importantly, it asks about recovering the respondent’s own critical activities, not about how long a flooded supplier’s plant stays down. Those are different quantities, and setting one against the other is suggestive rather than decisive.
What survives the caveats is still worth your afternoon: the horizon firms had thought about was a week, the observed rebuilds ran from four weeks to six months, and if your own planning assumption is closer to the first number than the second, it is the one to revisit.
Resuming is not recovering.
There is a second distinction buried in that data, and it matters more than it sounds.
As at 1 June 2012, seven months after the flooding, 75 % of factories in the seven inundated industrial parks have resumed operations
but only 40% of those factories have recovered to pre-flood levels of production
(Haraguchi and Lall).
So three quarters were running and two fifths of those were back to normal output (Haraguchi and Lall). If your recovery number means “the day they ship something again”, you have understated it. If it means “the day they can meet my full order”, the Thai record says that is substantially later. Decide which one you are using and write it down, because the two produce different answers from the same method.
Two cases that cut the other way.
It would be dishonest to present only the slow recoveries.
Aisin, 1997. A fire destroyed the lines making a brake valve that Toyota single-sourced, at 32,500 P-valves a day
. It threatened to pull the entire Toyota group to a halt for several weeks
. What happened instead: By Monday, February 10, a little over one week after the plant fire, all Toyota group assembly plants were back to normal
(nine days by the account’s own dates) at a cost of about 70,000 vehicles
. That was the resume milestone, with production volumes of 13,000 to 14,000 vehicles per day
. Applying this article’s own distinction, full recovery came about a week after that, at the previously planned production volumes of
15,500 vehicles a day (Nishiguchi and Beaudet). I have paraphrased rather than quoted that sentence because the scan garbles a word in it.
So: resumed in nine days, fully recovered in about sixteen. Even then the output was not costless: Toyota officials claim to have recouped most of the lost vehicle production through increased overtime and holiday shifts.
(Nishiguchi and Beaudet) A total loss of a single-sourced part, closed out inside three weeks, because other firms in the network retooled to make the valve. That is a resilience result produced by relationships rather than by inventory or by a second supplier.
Renesas, 2011. After the Tohoku earthquake, Renesas engineers who assessed the damage originally estimated it would take six months to bring Naka back on line
and they managed to bring the Naka facility back on line in just three months, restarting production in June.
(IEEE Spectrum) The plant mattered because Renesas produces 30 to 60 percent of car microcontrollers and integrated circuit systems
(IMF). Note the same split again: restart in three months, with full capacity targeted for the end of September, roughly the original six-month estimate after all.
Renesas halved its own restart estimate; Toyota’s “several weeks” was the account’s characterisation of the threat rather than anyone’s forecast. Both firms were large and capable with enormous customers pushing. Read them as the optimistic end of the range, not as the expectation.
And one that ran long. After an explosion at a chemical plant in March 2012 destroyed production of a precursor chemical, the specialty nylon made from it, used in fuel lines, went short, causing nine months of supply disruptions to the auto sector
(PlasticsToday). One plant, one precursor, nine months.
4. Why any of this is worth the afternoon it takes.
The strongest published evidence on what disruptions cost is a study of 827 announcements by listed firms between 1989 and 2000: Based on a sample of 827 disruption announcements made during 1989-2000.
, over a window running from a year before to two years after, the average abnormal stock returns of firms that experienced disruptions is nearly -40%.
(Hendricks and Singhal)
A few details that make it more useful than the headline:
- The damage is not a one-day event.
Much of this underperformance is observed in the year before the announcement, the day of the announcement,
and the year after. In the year after alone,In the year after the announcement sample firms on average lose another 10.45% relative to their benchmark portfolios.
(Hendricks and Singhal). - It does not revert.
firms do not quickly recover from the negative effects of disruptions
, and risk rises durably:The equity risk in the year after the announcement is 13.50% higher
than the year before, andThe increase in equity risk is not temporary as firms stay at the higher risk level for at least the next year.
(Hendricks and Singhal). - Cause matters, and all three causes are bad. The three-year mean abnormal return runs
for disruptions due to internal failures, -24.93% for supplier caused disruptions,
andand -52.88% for customer caused disruptions.
That is -35.69 percent for internal failures, -24.93 for supplier-caused and -52.88 for customer-caused. The failure mode closest to this article’s subject:Parts shortages are associated with a statistically significant mean abnormal return of -25.48%
(Hendricks and Singhal). - Size does not protect you, and the middle of the distribution is the worst place to be. The paper reports
A -20% abnormal return for the largest firm (size deciles 9 and 10) and -33% for the next largest group
, but its size table runs worse below that, to-46.68%
for deciles 5 and 6 and-64.28%
for deciles 3 and 4. Its own summary:Although there is some evidence to suggest that mean abnormal returns for smaller firms are more negative than larger firms, the abnormal returns for larger firms are still economically significant.
andOverall, supply chain disruptions are bad news irrespective of the size of the firm.
(Hendricks and Singhal) If you are reading this as a mid-size firm, the cells that look like you are the bad ones, not the -20.
How to read this if you are not listed. These are abnormal returns: the shortfall against a matched benchmark portfolio, not a fall in the firm’s value (Hendricks and Singhal), so the specific percentages do not transfer to a private company. What transfers is the shape: the shortfall is large, it is spread over years rather than days, it does not bounce back, and supplier-caused and parts-shortage disruptions sit squarely in the middle of the range. A private firm’s version of a 40 percent three-year abnormal return is a bad couple of years of margin and some customers who do not come back.
5. The finding that argues against the standard advice.
Almost every resilience article ends at “diversify your supplier base”. There is published evidence that complicates it, and leaving it out would be convenient.
A study using over 2.5 million US maritime import manifests, covering publicly traded US firms, found that supplier diversification is associated with slower recovery from sourcing interruptions
, while the use of long-term relationships is associated with faster recovery
, sized as follows: A one standard deviation decrease in the former is associated with a 16% faster recovery, and a like increase in the latter is associated with a 20% faster recovery
(London Business School).
Take that with its limits attached: it is an association in observational data rather than a controlled result, the sample is large listed US importers rather than mid-size Indian firms, the summary I could reach gives no period and no absolute recovery times, and recovery speed is not the only thing diversification buys: a second source also reduces the chance of being fully cut off in the first place. But the direction is the opposite of the advice, and the mechanism is easy to believe: a supplier who has had half your volume for nine years will move mountains for you, and four suppliers with a quarter each will each assume one of the others is covering it.
Aisin is the same lesson from the other end. Toyota’s recovery came from a network of firms with deep, long relationships that retooled for a part they did not make. Diversification would not have produced that.
So the honest version of the advice is narrower. A second source protects you against total loss of supply. A deep relationship with your main source protects your recovery speed. They are different purchases and you should know which one you are making.
6. Concentration you may not know you have.
Text version
A diagram with three boxes on the left labelled Supplier A, Supplier B and Supplier C, each with an arrow running to the right. All three arrows converge on a single shaded box labelled one mill, one country. A line beneath reads that dual-sourcing tier one buys nothing here. The diagram shows how a supply base that looks diversified at the first tier can rest on one point of failure at the second.
Tier 1 can look diversified while tier 2 is a single point of failure. Three published examples of the shape:
Your country’s own exposure, officially stated. In answer to a parliamentary question, India’s Ministry of Chemicals and Fertilizers gave China’s share of India’s imports of bulk drugs and drug intermediates as 66.69%
in 2016-17 and 67.56%
in 2018-19, on Directorate General of Commercial Intelligence and Statistics data (Lok Sabha, 19 November 2019). The answer’s middle year is stated as 68.36 percent, though its own absolute figures for that year work out to 68.69, so treat that one loosely.
Note what the figure is and is not: it is the import share, not the share of everything Indian formulators consume, since India also makes bulk drugs itself. Still, if you formulate or distribute pharmaceuticals, about two thirds of what the country imports traced to one place, and your five Indian suppliers may all have been buying from it.
A regional flood that became a global shortage. In the first half of 2011, Thailand accounted for 40 to 45 percent of worldwide HDD production
(eWeek), and the flooding directly affected close to half of that capacity. Buyers of computers in other continents discovered they had a Thai exposure.
And a current one. The US Geological Survey’s 2025 estimates put world rare-earth mine production at 390,000
tonnes of rare-earth-oxide equivalent, with China at 270,000 of it, a figure its own footnote describes as a Production quota; does not include undocumented production
(USGS Mineral Commodity Summaries 2026). That is about 69 percent by my arithmetic on their figures. Note what the survey does not publish: a country breakdown of separation and refining capacity, which is the tighter chokepoint and the number everybody actually wants.
The practical move is unglamorous. For your handful of genuinely critical inputs, ask each supplier where they buy the key material, and whether any of them share a source. One afternoon of asking, and the answers tend to surprise people.
7. What insurance does and does not do.
Worth knowing before you assume a policy covers this. The clearest buyer-side account comes from a risk managers’ association rather than an insurer, and it is blunt: several recent events, particularly the Icelandic dust cloud, have demonstrated the weaknesses in existing business interruption insurance coverages
, and insurance relating only to insured perils at named locations is no longer adequate for many organisations
. On availability: there is still only limited insurance market appetite for this type of insurance
, and several insurers will not offer supply chain insurance at all
(Airmic).
Date caveat, which matters here. That document carries no publication date; it says its research began in 2012 and refers to the 2011 Icelandic ash cloud as recent, so it is over a decade old and the market has moved. Treat it as the right set of questions rather than the current state of the market.
What is more recent, and bleaker: in a 2018 survey, 47 percent of the 220 respondents who answered the question reported that 0%, losses were uninsured
; that is, none of their disruption loss was covered (Business Continuity Institute).
So: check whether your policy covers interruption at a supplier’s premises as opposed to your own, and check the exclusions. Do not assume.
Limits: where this does not apply.
- The method ranks exposure; it does not price it, and it is probability-free only as far as the ranking. It tells you where survival is shorter than recovery, which you can establish from a stock report and a phone call. Deciding what to spend on closing those gaps is a separate judgement that does bring likelihood back in, and the published work at Ford pairs the ranking with a performance-impact figure that needs a model most mid-size firms will not build. Expect the method to tell you where to look, not what to spend.
- The recovery times quoted here are from large firms in automotive, electronics and chemicals, mostly from events between 1997 and 2012. They establish the order of magnitude, not your number. Your supplier’s answer about their own plant beats any of them.
- The financial evidence is from listed firms in a 1989 to 2000 window, and measures abnormal returns against a benchmark rather than falls in firm value. The shape of the damage transfers; the percentages do not.
- The diversification finding is observational, from US maritime import data, and should not be read as “do not dual-source”.
- This article does not cover demand-side disruption, regulatory shocks, cyber incidents, or the people risk of a single irreplaceable employee, which in a mid-size firm is often the largest single-point failure of all.
- Nothing here is insurance advice. The policy questions are for your broker, and the one document quoted is old.
Where to start.
A first pass takes an afternoon:
- List the inputs you could not replace within a month. Not your biggest spend. The ones with no qualified alternative, or a long qualification, or a tooling or regulatory barrier. For most mid-size firms this list is between five and twenty items, and it is much shorter than the purchase ledger.
- For each, write down how long you could keep serving customers. Finished stock, plus work in progress, plus raw material, plus anything you could substitute. In days. This is the survival number and you can compute it from your own stock report.
- For each, get a recovery number. Ask the supplier. If they will not say, use your lead time as the proxy, then sanity-check it against the record in section 3 rather than against a week.
- Mark every input where survival is shorter than recovery. That is your exposure list, and it will not look like your spend list.
- For the items on it, ask your supplier where they buy the critical material, and whether any of your alternates share a source.
- Then choose per item, not by policy. More stock buys survival time. A second source buys protection against total loss. A deeper relationship with the incumbent buys recovery speed. Qualifying an alternate now buys optionality later. Each is a different purchase and the method tells you which gap you are trying to close.
- Write the numbers down with a date and revisit them yearly. Lead times move, stock policies change, and a supplier who consolidated two plants into one has just changed your recovery number without telling you.
Nothing in that list needs a risk function, a consultant, or a probability.
Frequently asked questions.
What is supply chain resilience?
In the sense that can be measured: the ability to keep serving customers while a part of your supply is unavailable, and to restore normal supply afterwards. The two published quantities behind it are time-to-survive, the longest a firm can function without a given node, and time-to-recover, how long that node takes to return to full functionality. Resilience as a word covers a great deal more; those two are the part you can compute.
How do I assess supply chain risk without a risk team?
Use the time-to-survive against time-to-recover comparison, which was designed to defer probability estimates because managers cannot reliably make them for rare events. For each input you cannot easily replace, compare how long you could cope without it against how long it would take to come back, and treat the shortfall as your exposure. The inputs are a stock report and a question to each supplier.
How long do supply chain disruptions actually last?
Longer than firms plan for. After the 2011 Thailand floods, Nissan resumed in 29 days, Toyota in 42, Western Digital partially in 46 and Honda in 174 (Haraguchi and Lall). A chemical plant explosion in 2012 caused nine months of disruption to the auto sector. By contrast, a survey of 310 organisations found one week was generally the longest outage respondents had considered (Business Continuity Institute). Renesas reopened a damaged fab in three months against its own estimated six, and Toyota’s assembly plants were back to normal volumes nine days after a single-source brake-valve fire, in full planned volume about a week later.
Is resuming production the same as recovering?
No, and the difference is measurable. Seven months after the Thailand floods, 75 percent of factories in the inundated parks had resumed operations but only 40 percent of those had returned to pre-flood output (Haraguchi and Lall). Decide which definition your recovery number uses, because the two give different answers.
Should I dual-source everything?
No, and there is evidence against doing it reflexively. A study of over 2.5 million US import manifests found supplier diversification associated with slower recovery and long-term relationships with faster, by about 16 and 20 percent for a one standard deviation move (London Business School). A second source protects against losing supply altogether; a deep relationship with your main source protects how fast you come back. Choose per input, knowing which of the two you are buying.
What does a supply chain disruption cost?
For listed firms, a study of 827 disruption announcements found a mean abnormal stock return of nearly minus 40 percent over a three-year window from one year before to two years after, with parts shortages at about minus 25 percent, no quick recovery, and equity risk 13.5 percent higher in the following year (Hendricks and Singhal). Those are shareholder returns and will not transfer to a private company, but the shape does: large, spread over years, and slow to reverse.
Does business interruption insurance cover a supplier’s failure?
Not necessarily, and you should check rather than assume. A risk managers’ association found that cover limited to insured perils at named locations is no longer adequate for many organisations, that market appetite for supply chain cover is limited, and that some insurers decline it altogether, though that document is over a decade old. More recently, the largest group in one survey of disruption losses reported that none of their loss was insured.
What is the first thing to do?
List the inputs you could not replace within a month, and for each write down how many days you could keep serving customers without it. That single column, which you can build from your own stock report in an afternoon, is half the method and the half most firms have never written down.
Sources.
16 references
Every page cited above, in the order it first appears. The research files list every page opened, including those that could not be reached.
- Identifying Risks and Mitigating Disruptions in the Automotive Supply Chain Interfaces, 2015-10
- Disruption risk mitigation in supply chains: The risk exposure index revisited (full text PDF) Operations Research 67, 2019
- Identifying Risk Exposure in a Global Retail Supply Chain (MIT thesis) DSpace@MIT, Massachusetts Institute of Technology, 2021-06
- Flood Risks and Impacts: Future Research Questions and Implication to Private Investment Decision-Making for Supply Chain Networks Background Paper prepared for the UNISDR Global Assessment Report on Disaster Risk Reduction 2013, 2013
- Supply Chain Resilience 2010 (second annual survey) Business Continuity Institute, 2010-10
- Self-Organization and Clustered Control in the Toyota Group: Lessons from the Aisin Fire MIT DSpace, 1997
- How Japanese Chipmaker Renesas Recovered From the Earthquake IEEE Spectrum, 2011-08-23
- Shaken to the Core (Finance & Development, June 2011, Vol. 48, No. 2) International Monetary Fund, 2011-06
- Polyamide 12 precursor plant gets green light to restart PlasticsToday, 2012-12-06
- An Empirical Analysis of the Effect of Supply Chain Disruptions on Long-run Stock Price Performance and Equity Risk of the Firm Working-paper PDF hosted by Boston University Questrom School of Business, 2003-11
- Recovering global supply chains from sourcing interruptions: the role of sourcing strategy London Business School research summary, not stated on page
- Lok Sabha Unstarred Question No. 436 on import of bulk drugs / APIs, answered 19 November 2019 Lok Sabha / Ministry of Chemicals and Fertilizers, Department of Pharmaceuticals, Government of India, 2019-11-19
- Hard Disk Drive, PC Shipments Impacted by Thai Floods: IDC eWeek, 2011-11-11
- Mineral Commodity Summaries 2026: Rare Earths U.S. Geological Survey, 2026-02
- Review of recent developments in the supply chain insurance market (Airmic review of the supply chain insurance market) 2012 or later (no date stated)
- BCI Supply Chain Resilience Report 2018 Business Continuity Institute, 2018-08
Published by scimin, a product of Pralok Enterprise, Mumbai. scimin sells supply chain planning software and services. This article was researched and drafted with AI assistance. Every sourced figure links to the page it was checked against. Spot an error? Tell us and we will correct it with a dated note. How we write and check our articles.
See it in the product: demand forecasting for pharmaceuticals, demand forecasting for agri-inputs and how the forecast is built.