What a supply chain manager actually does all day.

Job-holders rate communicating above analysing data. One observational study of real planners’ shifts found half their interruptions were their own.

scimin21 minute read

Analysing data comes tenth

Importance rating, out of 100

Communicating
86
Organising work
85
Deciding
83
Getting information
82
Using computers
82
Relationships
80
External contact
78
Building teams
76
Processing info
75
Analysing data
73
All ten activities that logisticians rate above analysing their data. Nine of the ten are about getting, giving or deciding things with other people. Forty-one activities are rated in total. O*NET OnLine importance ratings for Logisticians, 13-1081.00, from questionnaires completed by job incumbents or subject matter experts.

What does a supply chain manager do all day?

Mostly: talk to people, chase information, and decide things on incomplete data. Analysis is in there and it is not the bulk of it. The people who hold the job rate communicating as more important to their work than analysing, every one of them reports daily phone calls, and for logisticians the single highest-rated task is maintaining relationships with a customer’s staff. The modelling you trained for happens in the gaps between those things.

That is not an opinion. The US Department of Labor’s O*NET database asks people who hold a job to rate how important each activity is to their work. For Logisticians, the highest-rated activity is Communicating with Supervisors, Peers, or Subordinates at 86 out of 100, followed by Organizing, Planning, and Prioritizing Work at 85 and Making Decisions and Solving Problems at 83. Analyzing Data or Information scores 73 and comes tenth of the forty-one activities rated (O*NET, Logisticians 13-1081.00).

For Supply Chain Managers, the top-rated activity of all is Establishing and Maintaining Interpersonal Relationships, at 86 (O*NET, Supply Chain Managers 11-3071.04).

And the single highest-rated task for logisticians, at 87, is not about optimisation at all: Maintain and develop positive business relationships with a customer’s key personnel involved in, or directly relevant to, a logistics activity. (O*NET)

If you are choosing this career because you like models, read that again. The models are real, but the job that pays for them is substantially a relationship job.

A note on the source, because it matters. O*NET’s data comes from questionnaires, and The questionnaires may be completed by job incumbents or subject matter experts. (O*NET Center) O*NET OnLine’s occupation pages do not show how many people answered, though the downloadable database does publish a sample size, a standard error and a 95 percent confidence interval for every rating: N Integer(4) Sample size and Lower CI Bound Float(7,4) Lower 95% confidence interval bound (O*NET data dictionary). So treat the figures below as structured ratings with real uncertainty around them, from people who do the work. It is also US data. The texture it describes travels better than the pay figures do.

On this page

1. The texture of the day, in percentages.

O*NET’s Work Context questions are the most useful thing in the database and almost nobody quotes them. They ask incumbents how often specific things happen, and publish the distribution of answers.

For logisticians: every single respondent reported telephone conversations as happening every day. Ninety-six percent reported daily email. Seventy percent reported daily face-to-face discussion. Sixty-seven percent reported constant contact with others, with another 21 percent in contact most of the time (O*NET).

Then the pressure items. Fifty-eight percent of logisticians reported Time Pressure every day. Seventy-five percent reported working more than 40 hours a week, and no respondent reported a working week shorter than 40 hours.

For supply chain managers most of the same items run harder: email every day for all respondents, face-to-face discussion every day for 90 percent, more than 40 hours for 85 percent, and 38 percent reporting conflict situations every single day. Two run very slightly the other way: daily time pressure 57 percent against the logisticians’ 58, and constant contact 62 percent against 67 (O*NET, 11-3071.04).

Share of supply chain managers reporting each of these every day

Share of respondents

E-mail
100%
Face-to-face
90%
Time pressure
57%
Conflict situations
38%
Angry people
15%
O*NET asks job-holders how often specific things happen. More than a third of supply chain managers reported conflict situations every single day. O*NET OnLine Work Context data for Supply Chain Managers, 11-3071.04, from questionnaires completed by job incumbents or subject matter experts. The web pages do not show how many answered; the downloadable database publishes a sample size and confidence interval per rating.

Two items are worth dwelling on because they cut against the heroic version of the job.

You have less autonomy than the title suggests. Only 29 percent of logisticians reported a lot of freedom to make decisions; 54 percent reported some (O*NET). Supply chain managers do better at 43 percent (O*NET). So the modal answer, for the planner role, is partial autonomy inside somebody else’s constraints.

Not every decision is critical, though read the whole distribution. On Consequence of Error, logisticians split 13 percent extremely serious, 21 percent very serious, 38 percent fairly serious and 25 percent not serious at all (O*NET). The modal answer is “fairly serious” and a quarter say not serious at all. So the industry literature that treats every stockout as a catastrophe is overstating it, but only a third of the people in the job think the stakes are low.

2. The one study that watched planners work.

Here is the gap in the literature that surprised me: almost nothing measures how a planner’s day is actually spent. The claim that planners spend most of their day firefighting is everywhere, and when I followed it, the page I kept arriving at turned out to be a scheduling-software vendor’s marketing page with no study, no sample and no figure behind it.

What does exist is the most detailed time-resolved observation I could find. Researchers shadowed seven production schedulers in the planning department of a Fortune 500 chemical company across nineteen full eight-hour shifts, observing in situ, and classified every task against a published model of the scheduler’s role: the model from Jackson et al (2004) providing the starting point, to which they added a fourth category of their own, because we have identified a significant time spent by schedulers in what could be defined as the transactional role (Larco, Wiers and Fransoo).

How schedulers’ observed time divided across roles

Share of observed time

Informational
49%
Decisional
29.5%
Transactional
12.2%
Monitoring
9.2%
Nineteen full shifts, seven production schedulers, observed in situ. Half the time went to getting and giving information; under a third to deciding anything. Observed time split from Larco, Wiers and Fransoo, BETA Working Paper 408, Eindhoven University of Technology, 2013: seven schedulers across nineteen eight-hour shifts in one Fortune 500 chemical company.

The split: Total 29.5% 49.0% 9.2% 12.2% across decisional, informational, monitoring and transactional roles. The authors’ reading is that the schedulers’ time was primarily used in fulfilling the informational role and then the decisional role (Larco, Wiers and Fransoo).

Roughly half the shift goes to getting information and passing it on. Under a third goes to deciding anything.

And then the finding that reframes the whole complaint. On average 14% of the tasks were selfinterrupted, with the percentage per individual scheduler ranged from 8 to 23%, and those self-interruptions account for 50% of interruptions (Larco, Wiers and Fransoo). Half the interruptions in a scheduler’s day were the scheduler’s own.

Better still: for 86% of the triggers, the scheduler can decide when to start a task (Larco, Wiers and Fransoo).

Read those two together. The job feels reactive, and for the great majority of incoming work the planner actually controls the timing. Which means a large part of the chaos is a time-management problem rather than an imposed condition, and the same study found that tactical time-management decisions were made by only three of its seven schedulers, the other four reporting that they made all such decisions at the operational or task level.

The day had routine in it too: certain schedulers checked the status of production orders every three hours, and stock monitoring was among the tasks which were done in the mornings by 5 out of 7 schedulers (Larco, Wiers and Fransoo).

Three caveats on this study, since it is carrying a lot of weight here. It is seven people in one chemical company, so it is a careful look at one site rather than a representative sample. They are production schedulers in a chemical plant, not demand planners or supply chain managers: the closest measured relative of the role this article is about, not the role itself. And it does not break time out into “expediting” or “rework” as categories, so even this study cannot tell you what share of the day is firefighting. As far as I can establish, nobody has measured that, which is worth knowing next time you see a percentage for it.

One framing from that literature is worth adopting, though. A published model of the scheduling task divides it into exception handling (steps 2-4)... problem anticipation (steps 5 and 6) and mechanical scheduling (step 7) (Larco, Wiers and Fransoo). Exception handling is modelled as part of the job, not as a deviation from it. If you go into this work expecting a clean run at a plan, the expectation is the problem.

3. What interruption actually costs.

The adjacent research is on information work generally, and it is better measured than anything specific to supply chain.

Researchers observed and timed 24 information workers, seven of them managers, for three and a half days each across more than 700 hours of observation. Findings, all from that paper:

  • 57.1% of all informants’ working sphere segments were interrupted, on the average. (Mark, González and Harris)
  • Average time on one thing before switching or being interrupted was 11 min. 4 sec., (sd=18 min. 9 sec.) before switching to another working sphere or being interrupted.
  • When interrupted work was resumed the same day, it took an average length of time of 25 min. 26 sec (sd=54 min. 48 sec.), having worked in our informants worked in an average of 2.26 (sd=2.79) working spheres. in between.
  • 77.2% of interrupted work was resumed on the same day. So roughly a quarter was not (Mark, González and Harris).
  • Resumption was almost entirely self-driven: work that was resumed by one’s self (90.1%). (Mark, González and Harris)
  • And for managers specifically, Managers are more likely to experience external interruptions (59.2%) than internal interruptions (40.8%) (Mark, González and Harris).

A statistic to stop repeating. You will often see “it takes 23 minutes and 15 seconds to refocus after an interruption”, usually attributed to this research. That figure is not in this paper. The measured figure here is 25 minutes 26 seconds, for work resumed the same day (Mark, González and Harris), and I could not find 23:15 in any published study.

A follow-up experiment found something less intuitive: We found that context does not make a difference but surprisingly, people completed interrupted tasks in less time but this comes at a price: experiencing more stress, higher frustration, time pressure and effort. Stress ratings rose significantly, stress was rated as significantly different across interruption type (F(2,92)=12.15, p<.001) (Mark, Gudith and Klocke). Worth its caveat: that one was 48 participants, mostly German university students, doing a simulated office task, not practising managers.

4. What the folklore gets right, and where it has been overtaken.

Every article on managerial work eventually cites Henry Mintzberg, who observed managers directly and found the textbook account of reflective, systematic planning did not survive contact with the data. A university summary of his findings puts it: activities are fragmented and brief, the manager shifts his/her attention rapidly from one issue to another, with very little pattern and drops all other issues to solve an acute problem (University of Houston). Those are the lecturer’s words for Mintzberg’s findings, not Mintzberg’s own. Secondary accounts give the duration figure as Most of these activities were brief, lasting less than nine minutes. (OpenStax), with one course summary adding engages in most activities for less than 9 minutes, and only 10% of activities exceed 1 hour in duration (University of Houston).

Three honest qualifications, because this is cited far more confidently than it deserves.

The original study was tiny. Five chief executives, observed for a week each on the standard retelling, though the only figure I could source is the five. A later review of this literature says so bluntly: Yet they use very small N’s (Mintzberg used 5; Kotter used 15; and the studies (Luthans et al.).

I could not read the primary source. Mintzberg’s 1975 article is paywalled and his own site carries only a citation (mintzberg.org), so every duration figure above comes from textbooks and course material summarising him. Those say most activities ran under nine minutes. The widely circulated “half the activities” version I could not corroborate anywhere, so do not trust it.

And the central finding did not fully replicate, though the replication’s own sample size is not stated in anything I could reach, so this is not a case of a big study overturning a small one. A study published thirty years later found that One important finding is that fragmentation of time - in previous studies highlighted as a central tenet of managerial work - was not as prevalent in the new study. (Tengblad) It found a heavier workload and more time with subordinates, while concluding that claims of a radically different managerial job were exaggerated.

There is also a detail in the old literature that lands differently in a planning context: Mintzberg Another difference Is that Hintsberg did not observe his managers doing planning. (Luthans et al.) The typo is in the source. The observation is not a joke, though: the planning in a planning job is the part that gets displaced.

5. The month has a shape, even if the day does not.

If the day is fragmented, the month is not. The sales and operations planning cycle gives the role its calendar, and it is published.

The professional body’s description runs in six steps: forecasting, where Gathering data with regards to past sales enables organizations to create forecasts for future sales (ASCM); demand planning; supply planning; a pre-meeting; an executive meeting; and finalisation.

For the cadence and the shape of the meetings, university teaching material is more specific: the cycle runs Monthly and/or weekly and the meetings take 2 hours to half of a day; a worked example from a semiconductor firm in the same deck produces Plans by month for 18 months (MIT Center for Transportation & Logistics).

So a realistic month: a demand review attended by sales, marketing and supply chain; a supply review with finance and manufacturing; then an executive session. Between them, the work in sections 1 to 3.

One thing is not published, and I looked: neither source states which days of the month each meeting falls on. If you see a tidy day-by-day S&OP calendar, it is somebody’s convention, not a standard.

6. Hours, honestly, with the Indian figure.

This is where most career articles either sensationalise or go quiet. The evidence is mixed and the Indian data point is the interesting one.

Hours. The largest time-use study of senior managers reconstructed diaries for 1,114 chief executives across six countries through daily phone interviews over a randomly chosen week. The average: the average CEO in our sample spends 52 hours per week (10.4 hours per day) at work. But the country pattern has one exception, and it is ours: weekly hours were above 50 across all countries except India, where the average number of hours worked across all CEOs is significantly lower (Bandiera, Lemos, Prat and Sadun, NBER). India had the largest single-country sample in that study.

That is chief executives, not supply chain managers, and it is a measure of hours at work rather than of intensity. Take it as a corrective to the assumption that Indian management roles are uniformly the longest-hours ones, not as a promise about your week.

Burnout, both ways. One survey of 104 US supply chain professionals found overtime and non-traditional hours mattered more than pay in driving burnout. A separate survey measured prevalence rather than causes, among 102 supply chain managers: 68,6% of the respondents (70 out of 102) had a score indicating no risk of burnout (green level). That leaves roughly 31 percent at or above risk: 19.6 percent at risk and 11.8 percent at very high risk. The authors are refreshingly candid about their own limits: It is not random and representative of the studied country’s entire population of SC managers. (Dobroszek et al.)

Note that those two studies are not opposites: one asks what drives burnout, the other how common it is, and a finding that overtime drives it is perfectly consistent with most of a particular 102 people not having it. Both are small and self-selected. Anyone telling you confidently that this career burns people out, or that it does not, is ahead of the evidence.

7. In India, the job has no manager-grade name.

This is the finding I did not expect, and it explains a lot about why career information here is so poor.

India’s National Classification of Occupations 2015 is the official occupational taxonomy, and what it contains is narrower than it should be. At manager grade, the relevant family is 1324, Supply, Distribution and Related Managers, and its titles are Manager, Material Control, Manager, Storage and Warehousing, Material Co-Ordination Manager and Manager Vendor Development (National Classification of Occupations 2015). No occupation in that family is called supply chain manager or logistics manager.

The phrase does exist in the classification, but below manager level: the occupational table lists Associate - Supply Chain Management at 3323.0601 and Supply Chain Field Assistant at 3323.0602, in family 3323, Buyers (NCO-2015 occupational table). So India’s classification recognises supply chain work as an associate-grade job under purchasing, and does not recognise it as a management occupation at all. That is the finding, and it is a more specific one than “the job has no name”.

Two consequences follow.

First, there is no credible India-wide salary figure for this job, and I am not going to invent one. If the national occupational classification has no such occupation, the official earnings surveys have nothing to attach a number to. Every Indian “supply chain manager salary” figure you will find comes from a job-aggregator site that publishes neither its sample nor its method. For the same reason, treat US figures carefully too: O*NET publishes pay for Logisticians, at $82,320 a year against 255,100 people employed (O*NET), but it publishes no separate wage series for Supply Chain Managers at all, and that page carries the broad occupation’s figure (O*NET). Anyone quoting a “BLS supply chain manager salary” is quoting transportation and distribution managers.

Second, where India does describe the job, it is in the skills system rather than the labour statistics, and those descriptions are good. The National Qualifications Register carries a Supply Chain and Logistics Analyst qualification at level 5, whose code carries 2025, whose modules include advanced demand planning and supply chain analytics, foundations of digital supply chain operations, strategic procurement and supplier management, and a sixty-hour module on logistics client relations and service excellence (National Qualifications Register). Client relations is a named, mandatory, sixty-hour module in India’s own standard for the role, worth knowing if you expected the qualification to be all analytics. I would not read more into the hours than that: six of its nine modules are sixty hours, so the equal weighting is what a uniform grid produces rather than a statement of emphasis.

There is also a Supply chain executive qualification whose mandatory modules run through inventory analysis and forecasting, data analysis and ERP reporting, negotiation and vendor selection, vendor performance monitoring, transport and route optimisation, and customs and EDI filing (National Qualifications Register). As a description of what the work involves in India, that list is more concrete than most job advertisements.

Limits: what this article cannot tell you.

  • Most of the quantitative evidence is not Indian, and none of it is about Indian supply chain roles specifically. The occupational ratings are US. The scheduler study is one European-run observation in a chemical firm. The interruption research is US and German. Only the hours figure has an Indian component, and that is chief executives.
  • O*NET’s web pages do not show how many people answered each item. The downloadable database does carry a sample size and a 95 percent confidence interval per rating (O*NET data dictionary), which I have not pulled, so the percentages here are quoted without their error bars. The data may also come from subject matter experts rather than job-holders.
  • The scheduler time-split is seven people in one company. It is the best measured data I could find and it is not a representative sample.
  • I could not find any measurement of the firefighting share of a planner’s day. If you need that number, it does not exist yet.
  • This is the manager and planner role, not the warehouse, transport or procurement roles, which have different days and different published task lists.
  • No salary guidance, for the reason given in section 7.

If you are deciding whether to do this job.

A few things the evidence supports:

  1. Test whether you like the communication load, not the analysis. The modelling is the smaller part. If daily phone calls, daily email, standing contact with people who want something from you, and regular conflict sound draining rather than energising, the data says that is the job rather than a bad version of it.
  2. Expect partial autonomy. Most planners report some freedom rather than a lot. You will be optimising inside constraints other people set.
  3. Learn to sequence your own work early. Half of a scheduler’s interruptions were self-inflicted and most incoming work let them choose when to start. The people who did that deliberately were a minority. That is the cheapest available edge in this job.
  4. Expect more than forty hours, on the US occupational evidence. Do not assume the worst about India on the strength of the one Indian figure available, which is chief executives of manufacturing firms rather than supply chain managers.
  5. Judge the burnout question for yourself, because the published surveys are small, self-selected, and measure different things.
  6. In India, read the qualification packs rather than the job ads. The National Qualifications Register descriptions are specific about modules and hours, and they are free.

The useful version of this job description is short. You will spend your day finding out what is actually happening, telling other people about it, and making calls that are partly constrained. Some of those calls will matter a great deal and a surprising number will not. Once a month, give or take, a short series of reviews ends in a meeting where the plan is agreed. The analysis you trained for is what you do in the gaps, and protecting those gaps is most of the skill.

Frequently asked questions.

What does a supply chain manager do all day?

On the occupational survey evidence: communicates, organises and prioritises work, makes decisions, and works with computers, in that order of rated importance, with analysing data tenth of forty-one activities for logisticians (O*NET). Every surveyed logistician reported daily phone calls, 96 percent daily email, and 38 percent of supply chain managers reported conflict situations every day (O*NET). Monthly, in most published descriptions, a series of reviews ends in an executive meeting where the plan is agreed.

Is supply chain management an analytical job?

Partly, and less than the title suggests. The people in the job rate communication above analysis, and the single highest-rated task for logisticians is maintaining business relationships with a customer’s key personnel. An observational study of seven schedulers found about half their shift went to informational work and under a third to deciding anything. Analysis is real but it is the minority of the day.

Do supply chain planners really spend all day firefighting?

I could not find any measurement of it, which is worth knowing because the claim is everywhere. The source I kept arriving at for it turns out to be a software vendor’s marketing page with no study behind it. The nearest real data (Larco, Wiers and Fransoo) found that 14 percent of schedulers’ tasks were self-interrupted, that those accounted for half of all their interruptions, and that for 86 percent of incoming triggers the scheduler could choose when to start, so the day is less externally driven than the folklore says.

How many hours does a supply chain manager work?

On US occupational survey data, 75 percent of logisticians and 85 percent of supply chain managers reported working more than 40 hours a week, with none reporting less than 40 (O*NET). For senior managers generally, the largest diary-based study found an average of 52 hours a week across six countries, with India the one country significantly below 50. There is no equivalent measurement for Indian supply chain roles.

Is supply chain a stressful career?

The honest answer is that the published evidence is thin and points both ways. Fifty-eight percent of logisticians reported daily time pressure, and 38 percent of supply chain managers reported daily conflict situations (O*NET). But the modal logistician called the consequences of error only “fairly serious” and a quarter said not serious at all (O*NET), and one survey of 102 supply chain managers found nearly 70 percent at no risk of burnout, with about 31 percent at or above risk, on a sample its own authors describe as not representative.

What is a supply chain manager’s salary in India?

There is no credible India-wide figure, and the reason is interesting: India’s National Classification of Occupations 2015 contains no manager-grade occupation called supply chain manager or logistics manager (NCO-2015): the phrase appears only at associate level, under Buyers, so the official earnings surveys have no such occupation to measure. Figures circulating online come from job aggregators that publish neither sample nor method. Be equally careful with US figures: O*NET publishes pay for Logisticians but no separate wage series for Supply Chain Managers.

What skills does the job actually need?

Judging by what is rated and what is taught: communication first, then prioritisation and decision-making under incomplete information, then the technical work. India’s own level-5 Supply Chain and Logistics Analyst qualification includes a mandatory sixty-hour module on logistics client relations and service excellence alongside its demand planning and analytics modules.

Does the work get less chaotic as you get more senior?

The data suggests it changes rather than settles. Supply chain managers report more freedom to make decisions than logisticians, 43 percent against 29 percent reporting a lot of freedom (O*NET), but also longer hours and more frequent conflict. And the classic finding that managerial work is fragmented into very short activities did not fully replicate when the study was repeated thirty years later, so treat confident claims in either direction with care.

Sources.

20 references

Every page cited above, in the order it first appears. The research files list every page opened, including those that could not be reached.

Published by scimin, a product of Pralok Enterprise, Mumbai. scimin sells supply chain planning software and services. This article was researched and drafted with AI assistance. Every sourced figure links to the page it was checked against. Spot an error? Tell us and we will correct it with a dated note. How we write and check our articles.

See it in the product: the app, industry by industry and how the forecast is built.

Talk to us about planning work.

Related articles.